Similar Projects
Intersection Improvements - CSAH 13 - CP 0013-369675
Infrastructure
Conception
$2,200,000 est. value
Muskogee, OK 74401

Utilities - US 62
Infrastructure
Design
$250,000 CJ est. value
Muskogee, OK 74401

Resurface (Asphalt) I-35 from 1.0 Mile South of US-60 Extend North Near Tonkawa and Blackwell
Post-Bid
OK

Tonkawa Street Improvements to Various Streets
Infrastructure
Post-Bid
$370,000 est. value
Tonkawa, OK

Resurface (Asphalt)
Results

Resurface (Asphalt)
Results
Muskogee, Wagoner, OK

Muskogee Port Access Road Extension
Infrastructure
Post-Bid
$340,000 est. value
OK

Widen, Resurface, and Bridge Rehabilitation
New Construction
Results

Wash Pad Improvements - Three Forks Harbor
Infrastructure
Post-Bid
$515,000 est. value
Fort Gibson, OK 74434

Resurface
Results
Wagoner, OK 74467

County Road Resurfacing and Low Water Crossing Replacement
Infrastructure
Post-Bid
$620,000 est. value
Muskogee, OK

Fort Gibson Learning Trail
Infrastructure
Results
Fort Gibson, OK

Demolition of Structure - 4th Street
Demolition, Infrastructure
Post-Bid
$290,000 CJ est. value
Tonkawa, OK 74653

Joint Seal/Repair
Infrastructure
Results

Meter Replacement
Infrastructure
Post-Bid
$200,000 CJ est. value
Ponca City, OK 74601

Last Updated 07/25/2022 01:31 AM
Project Title

Pedestrian Improvements (Sidewalks) City Streets

Physical Address View project details and contacts
City, State (County) Newkirk, OK 74647   (Kay County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $997,293 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Pedestrian Improvements (Sidewalks) City Streets (Walnut Ave/maple Ave/main St/2nd St/3rd St/6th St/9th St): at Multiple Locations in the City of Newkirk.Project Length = 0.967 Mile Counties: Haskell Calendar Days: 120 DBE Goal: 11.50 Submit Any Questions or Concerns to the Office Engineer Division via: - Email: Odot-prebid.question@odot.org - Phone: (405) 521 - 2625 Each Bid Shall Be Accompanied by a Certified or Cashier's Check or Bid Bond Equal to 5% of the Bid Made Payable to the State of Oklahoma, Department of Transportation, as a Proposal Guaranty. Proposal Checks Will Be Held or Returned by the Department as Per Subsection 103.04 of the State Standard Specifications. ODOT- Call Order 785 - Pedestrian Improvements (Sidewalks) City Streets

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents