Similar Projects
Install Emergency Cooling Tower Makeup Water
Design
$500,000 to $1,000,000 est. value
Cape Canaveral, FL 32925

Live Oak Drainage Wells Phase 1
Bidding
Less than $400,000 est. value
Live Oak, FL

LMI Milton Roy Metering Pump
Post-Bid
Tampa, FL 33602

Jet Water Pump Replacement
Post-Bid
Orlando, FL 32826

Replace Chiller and Pumps at USCG Sector Key West, Florida
Results
$250,000 to $500,000 est. value
Big Coppitt Key, FL 33040

Rental, Pump Equipment
Term Contract
Results
$1,250,000 est. value
FL

Cleaning of Well at Highland Village
Post-Bid
North Miami Beach, FL 33162

Regional Facility Site Pump Station Expansion Project
Results
$2,168,480 est. value
Clearwater, FL 33763

Atlantic/Brentwood Deep Injection Well, IW-1 Acidization and Rehabilitation
Post-Bid
Less than $250,000 est. value
Sarasota, FL 34230

South Hillsborough Aquifer Recharge Expansion
Results
$1,643,200 est. value
Tampa, FL 33600

SDWWTP Plug and Abandon FA Monitoring Wells and Install / Replacement of FA Wells
Post-Bid
Less than $3,810,945 est. value
Cutler Bay, FL 33190

N--Services: Replace Chilled Water Pumps (Service Only - Pumps/Motors Supplied)
Results
Miami, FL 33125

Pump
Post-Bid
Lakeland, FL 33801

Public Water Supply Well Construction
Results
Live Oak, FL 32064

Removal, Repair and Re-Installation of Two Vertical Single End Suction Axial Flow Pumps and Right-Angle Gear Drives
Post-Bid
Coral Springs, FL

Last Updated 09/17/2020 04:35 AM
Project Title

Well 15 South Profile Well and Remediation Well R-4

Physical Address View project details and contacts
City, State (County) Hobe Sound, FL 33455   (Martin County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of the construction of a two (2) inch diameter water quality/quantity Test Well, 15S, installed via six (6) inch diameter pilot hole to approximately 200 feet deep with geophysical logging. Test well interval sampling to be performed for up to 10 zones and after testing, the borehole will be plugged, abandoned and site will be restored to original condition. The Project also consists of construction of a six (6) inch diameter well for the Saline Groundwater Recovery Well R-4, which includes installation of raw water main, connection to an existing four (4) inch raw water main, pump installation and electrical work. Prior to installation, a two (2) inch diameter Test Well casing and screen will be installed to a depth of 180 feet below land surface to perform interval sampling for up to 8 zones.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents