Project Title | Dorset Street Final Design - Phase III - Dorset Street Pavement Rehabilitation (Garden Street to Aspen Drive) |
Physical Address | View project details and contacts |
City, State (County) | South Burlington, VT 05403 (Chittenden County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development |
Contracting Method | Competitive Bids |
Project Status | Construction start expected August 2022 |
Bids Due | View project details and contacts |
Estimated Value | $841,394 [brand] Estimate |
Plans Available from | Civil Engineer - 06/15/22 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | All questions about the meaning or intent of the bid documents must be received by 5:00 PM on July 14, 2022 Please contact Stephen Haas, shaas@hoyletanner.com, 603-460- 5168 or Donna Akerley, dakerley@hoyletanner.com, 603-460-4934 for meeting information at least five (5) days prior to the scheduled bid opening. The 5-day lead time is required in case the bid opening time changes. Each bidder must deposit with their bid, security in the amount of 5% of the bid in the form and subject to the conditions provided in the INSTRUCTIONS TO BIDDERS. Bids submitted by bidders that exceed their Maximum Dollar Capacity Rating (MDCR) as determined by the Vermont Agency of Transportation on an annual basis may be considered non-responsive. LOCATION: The Dorset Street Pavement Rehabilitation project limits will include approximately 2,000 linear feet of Dorset Street from the south side of the Garden Street intersection and ending at the south side of the Aspen Drive intersection. TYPE OF CONSTRUCTION: Work to be performed under this project includes: Pavement rehabilitation is anticipated to consist of a 2" cold plane, leveling course, and a 2" Superpave wearing course. Geometric layout and profile improvements are not anticipated. Other improvements will include catch basin repairs & grate adjustments, driveway apron repair including curb removal, curb ramp improvements, and durable pavement markings (recessed polyurea for longitudinal lines and Type A tape for symbols and crosswalks). Existing curbing, sidewalk, and median islands are anticipated to remain, unless otherwise noted. Replacement of traffic signal loop detectors at Aspen Drive will not be required, as the signal is currently set to Max recall and new detection equipment will be part of a future project. CONTRACT COMPLETION DATE: The Contract shall be completed on or before September 23, 2022. ENGINEERS ESTIMATE: For this Proposal the Engineers Estimate falls between $650,000 and $750,000. PREBID CONFERENCE: A pre-bid conference will not be held for this project. STANDARD SPECIFICATIONS: This contract is governed by the Vermont Agency of Transportation ("VTrans") 2018 Standard Specifications for Construction. QUESTIONS: During the advertisement phase of this project all questions shall be addressed solely to Stephen Haas, shaas@hoyletanner.com, 603-460-5168. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |