Similar Projects
Dillon Lake State Park Wastewater Improvements
Renovation
Conception
Nashport, OH 43830

Z--PEVI 200745 - Restore North and South Seawalls at Perry's Victory to Safeguard Site
New Construction, Term Contract
Design
$10,000,000 est. value
Put-in-Bay, OH 43456

Pump Station Construction
New Construction
Design
$1,500,000 est. value
Middletown, OH

Vanhyning Pumping Station Replacement Project
Bidding
$2,500,000 est. value
Napoleon, OH 43545

Eastern Regional Belt Filter Press Replacement
New Construction
Bidding
$4,200,000 est. value
Dayton, OH 45432

Buckeye Water District Raw Water Pump Station Improvements "Contract A" - Site, Pumps, Building "Contract B" - Electrical
Post-Bid
Wellsville, OH 43968

Small Pump Station Improvements
Post-Bid
Less than $800,000 est. value
Miamisburg, OH

Blue Fountain Lift Station Pump Replacement
Results
Gallipolis, OH 45631

Pump Station Replacement for Mumaugh Road and Cable Road
Results
Lima, OH

Booster Station Replacement - Portersville East Branch Water
Construction
$270,000 est. value
Malta, OH 43758

Industrial Corridor Pump Station and Force Main
New Construction
Construction
Ironton, OH 45638

Deer Run Force Main and Lift Station
Renovation
Bidding
$4,700,000 est. value
Dublin, OH

Vayview, Planeview, and Murwood Lift Station Elimination
Post-Bid
$5,000,000 to $19,999,999 est. value
Xenia, OH

JPWWTP Digester Improvements 650240-100000
Results
Less than $28,314,469 est. value
Columbus, OH

Water Reclamation Facility Anaerobic Digester Improvements Project
Renovation
Bidding
Dayton, OH

Last Updated 01/18/2022 05:22 AM
Project Title

Hocking Hills Wastewater System Improvements

Physical Address View project details and contacts
City, State (County) Logan, OH 43138   (Hocking County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $3,100,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Alternate 1: Visitor’s Center Lift Station $157,981; Alternate 2: Rehab Two Campground Lift Stations $82,390; Alternate 3: Concrete Retaining Wall in lieu of Block Wall $7,062.

Details

Lift and Pump Stations, Renovation, Sewage Treatment Plant, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents