Similar Projects
Junior Lifeguard Facility Modular Building
New Construction, Term Contract - 960 SF
Bidding
$500,000 to $750,000 est. value
Long Beach, CA 90803

Glen Avon Elementary School Sitework
Renovation, Infrastructure, Alteration
Bidding
Riverside, CA 92509

Material Handling Equipment Inspection and Repair Services
Post-Bid
Fairfield, CA - San Antonio, TX - Tacoma, WA 78226

2021 or Newer One (1) Propane Forklift
Alteration
Post-Bid
CA

Steamers Building Maintenance Platform
Alteration
Results
$170,000 est. value
Sacramento, CA

Short-Term Rental of Heavy Equipment Gravel Screening and Washing Equipment
Alteration
Results
Sacramento, CA

Victorville Water District Meter Endpoints
Alteration
Bidding
Victorville, CA

Lec Inlet Filter Platform Extension Construction
Alteration
Post-Bid
Lodi, CA 95242

WRCRWA Anaerobic Digester #3
Infrastructure
Bidding
$4,800,000 est. value
Corona, CA 92880

7320--Meal Tray System Replacement
Term Contract
Post-Bid
Livermore, Menlo Park, Palo Alto, CA

2020 or Newer T76 Bobcat Compact Track Loader and Brushcat, H-72" Mower Attachment r Equal
Alteration
Post-Bid
$74,000 to $80,000 est. value
San Diego, CA 92104

Kitchen Equipment for Nutrition Services
Alteration
Post-Bid
Costa Mesa, CA 92627

CHP Santa Nella Platform Scale Maintenance
Alteration
Post-Bid
Lebec, CA 93243

Grapevine-Scale Maintenance
Alteration
Post-Bid
Lebec, CA 93243

Dishwasher Replacement
Term Contract
Post-Bid
Fairfield, Travis AFB, CA 94535

Reported 09/18/2021 12:00 AM
Project Title

B023 Air Compressor Project

Physical Address View project details and contacts
City, State (County) Menlo Park, CA 94025   (San Mateo County)
Category(s) Single Trades
Sub-Category(s) Equipment
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of this project is for the demolition, and removal of steel fame(s), electrical conduits, pipes and any other obstructions of the removal of the existing air compressor and the installation of a new air compressor. The work scope is as follows: Labor and materials required for demolition, and removal of steel fame(s), electrical conduits, pipes and any other obstructions required for the safe removal of the existing air compressor. Labor and materials to remove existing bollards and install new removable bollards. Labor and materials required for the installation of a new air compressor. Installation of the new air compressor includes modifications to the existing equipment pad and the modification of the existing roof curb. Pressure test new pipe at 225 psig for 30 minutes. Roof curb design to match the existing roof curb. Provide shop drawing for approval of all fabricated components such as air duct and roof curb.

Details

Division 22 - Plumbing, General Service Compressed-Air Systems, General Service Packaged Air Compressors and Receivers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents