Similar Projects
2.0 Million Gallon Foster Elevated Storage Tank Overcoat Project
Infrastructure
Results
$1,185,000 est. value
San Antonio, TX

Amhurst Elevated Storage Tank Rehabilitation Project
Infrastructure
Post-Bid
$2,294,000 est. value
San Antonio, TX

Naco Ground Storage Tank Rehabilitation Project
Results
Less than $1,520,000 est. value
San Antonio, TX 78233

Cagnon Ground Storage Tank Replacement Project
Infrastructure
Results
$5,900,000 est. value
San Antonio, TX

Annual Contract for Tank Cleaning & Inspection
Term Contract
Results
$127,100 est. value
San Antonio, TX

Agricultural Storage Tank Upgrades at 10 Locations
Infrastructure
Post-Bid
$100,000 est. value
San Antonio, TX 78215

World-Wide Water Storage Tank Remediation
Term Contract
Results

Dietrich Elevated Storage Tank
Infrastructure
Results
$6,720,000 est. value
San Antonio, TX

Dezavala Elevated Storage Tank Project
Infrastructure
Results
$6,941,000 est. value
San Antonio, TX

Evans Ground Storage Tank Rehabilitation
Infrastructure
Post-Bid
$3,000,000 est. value
San Antonio, TX

J035--RFI-Sources Sought Thermal Energy Storage Tank Repair
Post-Bid
Houston, TX 77030

Upgrade 1000 Gallon Trinity Container
Results
San Antonio, TX

Steven M. Clouse Water Recycling Center Underground Storage Tank Removal Project
Results
$134,700 est. value
San Antonio, TX 78275

Sea World Tank Replacement Project
Infrastructure
Results
$3,726,000 est. value
San Antonio, TX

BVB Large Diameter Siphon Cleaning and Inspection
Infrastructure
Results
$2,587,058 est. value
San Antonio, TX

Last Updated 06/15/2022 01:47 AM
Project Title

North Patrol Underground Fuel Storage Tank Replacement

Physical Address View project details and contacts
City, State (County) San Antonio, TX 78247   (Bexar County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $700,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The general scope of this project includes, but is not limited to, the removal of two existing Underground Storage Tanks (USTs) and two fuel islands, and the installation of two new USTs and two new fuel islands. This includes double nozzle single product dispensers, double wall Underground Storage Tanks (USTs), double wall fire resistant fluid (FRF) piping, submerged turbine pumps, a leak detection system, concrete hold down slab over the USTs, and all other equipment presented in the plans and specifications. The canopy at the site will remain. The Contractor shall ensure the existing canopy is not damaged during demolition and construction. The new storage and dispensing system will include two double wall 12,000-gallon underground storage tanks (USTs) to store unleaded fuel. All gasoline components of this system shall be installed in accordance with the State of Texas 30 TAC ยง334 Subchapter C regulations. The Contractor installing this system shall be licensed in the State of Texas to install USTs.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents