Similar Projects
Demolition of Commercial Structure at 818 High Street
Demolition - 2,100 SF
Post-Bid
Portsmouth, VA 23704

Demolition Project
Post-Bid
Petersburg, VA 23803

P--Demolition Services- Shenandoah National Park, VA
- 1,500 SF
Results
Shenandoah, VA

Building Demolition at Staunton Crossing
Results
VA

The Massey Building and Annex Demolition Project
Demolition - 166,000 SF
Construction
$10,000,000 to $20,000,000 est. value
Fairfax, VA 22030

Newport News Transit Center Site Reconstruction
Construction
$47,000,000 est. value
Newport News, VA

Wall Build and Painting
Post-Bid
Richmond, VA 23220

Fort Eustis Multi Building Demolition Project
Demolition
Results
$1,000,000 to $5,000,000 est. value
Fort Eustis, VA

Structure Demolition 1211 Rodman Avenue
Demolition
Post-Bid
Portsmouth, VA 23704

Demolition of at Grade Concrete Slab and Related Restoration
Results
Newport News, VA 23607

Remove Building or Wall - 12183 Oakland Drive
Demolition
Post-Bid
Eastville, VA 23347

Nansemond Treatment Plant Land Acquisition - Land Stabilization (NP013500) and Nansemond Treatment Plan Land Acquisition - Structure Demolition (NP013600)
Results
$4,715,000 est. value
Suffolk, VA 23435

Remove Building or Wall - Indian Walk Lane
Post-Bid
Eastville, VA 23347

Basketball Court at Hillside Court
Term Contract
Results
Richmond, VA

Remove Building or Wall - 10727 Bayside Road
Post-Bid
Eastville, VA 23347

Last Updated 04/02/2021 12:41 PM
Project Title

Building 370 and Associated Buildings Demolition

Physical Address View project details and contacts
City, State (County) Dahlgren, VA 22448   (King George County)
Category(s) Heavy and Highway
Sub-Category(s) Demolition
Contracting Method Competitive Bids.
Project Status Pre-Solicitation
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Demolish Buildings 370, 370A, 370B, 409, 462, 1352: project is to completely demolish buildings/structures 370 (Rocket Laboratory), 370A (Magazine), 370B (Boiler House), 409 (Magazine/Weighing Room), 462 (Systems Integration Lab), and 1352 (Storage/Test Fixture Assembly Building) and restore sites. Project will consist of complete facility demolition, including the total removal of all foundations, removal and disposal of all utilities, site amenities, and associated site features. Demolition will include the termination of all site utilities (water, power, telecommunications etc.). Hazardous material testing and containment will be performed at all sites prior to the start of demolition. Site restoration activities will include back filling, grading and seeding the disturbed sites.

Details

Division 02 - Existing Conditions, Demolition.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents