Similar Projects
30th St And Kessler Blvd Area Drainage Improvements
Design
$3,600,000 est. value
Indianapolis, IN 46222

Mooresville and Mills Road Drainage Improvements
Design
Indianapolis, IN 46221

Bridge Replacement and Bank Stabilization in Brookshire Golf Club
New Construction
Bidding
Less than $1,000,000 est. value
Carmel, IN

Wisconsin Street and Alton Avenue Drainage Improvements
Bidding
$500,000 to $600,000 est. value
Indianapolis, IN 46225

Mississinewa Retreat Channel Repair
Post-Bid
$1,000,000 to $5,000,000 est. value
Peru, IN 46970

Trench Box Rental
Post-Bid
Indianapolis, IN 46077

Box Culvert Replacement and Debris Removal from Channel
Results
IN

Small Structure Pipe Lining
Results
IN

Culvert Replacement Asset PA2287 at 5000 Todd Road
Design
Indianapolis, IN 46237

Small Structure Pipe Lining
Bidding

48" Precast Reinforced Concrete Pipe
Post-Bid
Indianapolis, IN 46077

Bridge Painting and Small Structure Pipe Lining
Results

Small Structure Replacement and Scour Protection
Bidding
IN

West Aircraft Apron - Division A Grading and Drainage
Post-Bid
Kentland, IN 47951

Scour Protection
Results
IN

Last Updated 12/16/2020 02:58 PM
Project Title

Bauer Ditch Drain Tile Reconstruction

Physical Address View project details and contacts
City, State (County) Westville, IN   (La Porte County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes installation of drain tile, via open trench construction, including clearing and tree removal, stripping topsoil, excavation, placing bedding, laying drain tile pipe, placing initial & final backfill, replacing topsoil, shaping, trimming, and finishing, and cleaning, inspecting, and testing; installation of storm sewer structures, including stripping topsoil, excavation, placing bedding, setting precast reinforced concrete storm sewer structures, placing adjusting rings and castings, backfilling, replacing topsoil, shaping, trimming, and finishing, and cleaning. Excess excavated material generated during the performance of the work will be disposed of on the project site by spreading it within the regulated drainage easement associated with Bauer Ditch before replacing topsoil along the project reach. The project will also include placement of a casing and carrier pipe under US 6 via jack and bore installation methods. The project also includes other items incidental to the work, including maintenance of traffic, erosion and sediment control, and the restoration of areas disturbed during the performance of the work.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents