Similar Projects
Last Updated | 03/28/2023 10:12 AM |
Project Title | Gilbert Street Bridge Replacement - S3956 |
Physical Address | View project details and contacts |
City, State (County) | Iowa City, IA 52245 (Johnson County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Bridge, Paving/Reconstruction, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Construction start expected May 2023 , Construction documents |
Bids Due | View project details and contacts |
Estimated Value | $2,900,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | All bids rejected by city This project generally includes the removal and replacement of the existing four-lane concrete bridge with a new continuous concrete slab bridge over Ralston Creek, designed to meet local and state guidelines for traffic and pedestrians, six-foot sidewalks on both sides, and aesthetic improvements to enhance the neighborhood and views of the creek. Streambank stabilization will occur upstream and downstream of the new bridge with the addition of fabric formed concrete revetment and Class E revetment. Storm sewer will also be upsized from 15” to 30” diameter RCP pipe to provide additional capacity from Court Street to Ralston Creek where localized flooding during heavy rainstorms has been reported. Water main improvements will occur immediately north of the bridge to prepare for a future project. In addition, the project will include the undergrounding of overhead utilities within the project corridor. Engineer's Estimate $2,900,000 -------------------------------------------------------------------------------------------------------------------------------- UPDATE : https://user-9hywe2.cld.bz/Master-Proposed-Book-FY2023-copy1/538/ This project will replace the existing Gilbert Street bridge over Ralston Creek. In addition, the project will include removal and replacement of slope protection, sidewalk, storm sewer and street pavement, and other related work. Project is included City of Iowa City FY 2022-2026 CIP. Page 596 -------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- https://www.press-citizen.com/story/news/2022/02/15/iowa-city-public-hearing-217-million-budget-set-tuesday/9184728002/ Iowa City is also planning to replace the Gilbert Street bridge over Ralston Creek in downtown Iowa City for $3.1 million in 2023. The project will remove and replace slope protection at the bridge and includes work on sidewalks, storm sewer and street pavement. ___________________________________________________ This project will replace the existing Gilbert Street bridge over Ralston Creek. In addition, the project will include removal and replacement of slope protection, sidewalk, storm sewer and street pavement, and other related work. The project is included in the city's 2021-2025 Capital Improvement Program (CIP). As of December 27 2021, this project is in the design stage and construction is anticipated to begin in the Spring of 2023 as per source. Project is expected to bid out in 4Q of 2022 or 1Q of 2023* |
||||||||||||||||||||||
Details |
|
||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |