Similar Projects
Forest County Agricultural High School Addition & Renovation Esser 3 Project
Renovation, Addition
Design
Brooklyn, MS 39425

FTA Sidewalk Project Hardy Street - Kamper Park
Infrastructure
Design
$1,450,000 CJ est. value
Hattiesburg, MS 39401

Install Geomembrane Liner, Camp Shelby Joint Forces Training Center
Infrastructure
Bidding
$350,000 CJ est. value
Camp Shelby, MS 39401

Construct Wetlands Crossing Phase I Camp Shelby Joint Forces Training Center (CSJFTC)
Infrastructure
Bidding
$500,000 CJ est. value
Hattiesburg, MS 39401

New Roofing and Roof Repairs - Select Campuses
Renovation
Sub-Bidding
$407,000 CJ est. value
Hattiesburg, MS 39401

New Roofing and Roof Repairs - Select Campuses
Renovation
Sub-Bidding
$407,000 CJ est. value
Hattiesburg, MS 39401

F.B. Woodley Elementary School Interior Repairs and Exterior Repairs
Renovation
Post-Bid
Hattiesburg, MS

2021 Additions and Renovations
Renovation, Addition
Post-Bid
Brooklyn, MS 39425

New Cafeteria Building N. R. Burger Middle School
New Construction - 5,098 SF
Results
Hattiesburg, MS 39401

Gulf Coast Regional Hopper Dredge Contract. Specification No. OM-21-300
Infrastructure
Results
$25,000,000 CJ est. value
Gulfport, MS 39501

Training Aid Support Center (TASC) Org Parking
Infrastructure
Bidding
$1,600,000 CJ est. value
Camp Shelby, MS 39401

Petal School District - Primary School Addition
Addition
Post-Bid
$3,000,000 est. value
Petal, MS 39465

Installation for Outdoor Classrooms
New Construction
Results
$199,977 est. value
Brooklyn, Hattiesburg, MS 39401

Shed for Conduct of Fire Trailers (COFT)
New Construction, Infrastructure
Bidding
$200,000 CJ est. value
Hattiesburg, MS 39401

Lincoln Road Paving Project
Infrastructure
Post-Bid
$1,200,000 CJ est. value
Hattiesburg, MS 39402

Last Updated 08/04/2022 06:06 PM
Project Title

2021 Additions and Renovations Forrest County School District

Physical Address View project details and contacts
City, State (County) Hattiesburg, MS 39401   (Forrest County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Middle/Senior High School, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $25,124,813 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

For 2021 Additions and Renovations Forrest County School District A single bid, as well as separate bids, will be received for the project. Any questions regarding website registration and online orders should be directed to plan house at (601) 336-6378. The bid bond shall be payable unconditionally to owner. Bids on the project must be received on or before the period scheduled for the project and no bid may be withdrawn after the scheduled closing time for the project, for a period of 45 days. All bids submitted must comply with requirements of title 31, chapter 3 (31-3-1 et seq.) Of Mississippi code of 1972 as amended. Award will be made based on the lowest and best bid received in accordance with title 31, chapter 7 (31-7-13 et seq.) Of Mississippi code of 1972 as amended. The owner reserves the right to reject any and all bids and to waive informalities. Custom Bid Results BASE BID A - North Forrest High School JW Chain Contractors - $2,977,813.00 BASE BID B - Dixie Attendance Center Jay-Van Company - $3,480,000.00 BASE BID C - South Forrest Attendance Center Hanco Corporation - $2,997,000.00 BASE BID D - Earl Travillion Attendance Center Hanco Corporation - $2,870,000.00 BASE BID E - All Campuses Hanco Corporation - $12,800,000.00

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents