Similar Projects
Monongahela Riverfront for Recreational Use - Master Plan
New Construction
Conception
Pittsburgh, PA 15207

Allegheny Landing Park
Renovation
Conception
Pittsburgh, PA 15212

The Residences of Providence Town Center
New Construction - 93,470 SF
Design
Oaks, PA 19456

The Vine Street Lot Mixed Use
New Construction - 10,000 SF
Design
Philadelphia, PA 19106

Grings Mill Ramp Improvements Project
Renovation
Bidding
Wyomissing, PA 19610

Whitehall Road Regional Park Phase I
New Construction
Bidding
State College, PA 16801

Chestnut Ridge Terrace - Pavement Repairs, Parking Lot Seal Coat, Dumpster Enclosure and Playground Equipment Replacement Project
Post-Bid
Blairsville, PA 15717

South Park Trail Improvement Project
Post-Bid
South Park Township, PA 15129

Construction of a New Picnic Pavilion
New Construction
Results
Skippack, PA 19474

Memorial Park Expansion Phase 2
Results
Yardley, PA 19067

Learning Loft
New Construction, Renovation
Construction
Pittsburgh, PA 15223

Heroes Grove Amphitheater - Phase 2
New Construction - 150 SF
Construction
$562,000 est. value
Harrisburg, PA

Town Homes and Park Area
New Construction
Design
Murrysville, PA 15668

Bleacher Replacement - McDowell Intermediate HS and McDowell HS
Renovation
Bidding
Erie, PA 16506

Bethel Burying Ground Memorial At Wecaccoe Playground
Post-Bid
Less than $1,150,000 est. value
Philadelphia, PA

Last Updated 11/09/2021 10:51 AM
Project Title

Emlenton Hughes Park Phase II and III - Construction Contract 1

Physical Address View project details and contacts
City, State (County) Emlenton, PA   (Venango County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $180,000 to $210,000
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of interior renovation to the existing restroom building including new toilet stall partitions, new ADA toilet, urinal, and sink, replacement of existing toilet, miscellaneous fixtures and accessories, interior and exterior building paint, interior concrete floor resurfacing, conversion of bathhouse administration area to a picnic shelter. In addition to the interior renovation, the project also consists of new asphalt parking lot including drainage and ADA compliant parking; concrete sidewalks to access the restroom facility; ADA crushed stone walking trail; utility extensions and aquatic play equipment; electrical improvements and renovations; and site furnishings including picnic tables and trash receptacles.

Details

Park/Playground, New Construction.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents