Similar Projects
Well #1 / #2 Storage Reservoir & Booster Pump Addition
Results
WI

Bldg. 203 W5 Tank Replacement
Addition
Post-Bid
Milwaukee, WI 53207

Softener System Modifications
Results
Less than $180,000 est. value
Madison, WI

Elevated Spheroid Repainting and Repairs
Results
$389,500 est. value
WI

Washburn Water Tower Painting and Mixing
Results
Oshkosh, WI 54904

Elevated Tank Repaint
Term Contract
Results
Brookfield, WI

Lincoln Avenue 1.0 Mg Composite Water Tower Rehabilitation
Renovation
Post-Bid
Plover, WI

Frank H Elevated Tank Repainting
Results
Waunakee, WI

Dilution and Mixing Tanks 1 and 2 Rehabilitation
Results
Milwaukee, WI

Water Tower Rehabilitation
Post-Bid
WI

High-Vacuum Chamber Modification
Post-Bid
Madison, WI

Acid Crock Treatment
Bidding
Milwaukee, WI 53204

Last Updated 09/24/2020 11:52 AM
Project Title

2020 Digester and Storage Tank Cleaning

Physical Address View project details and contacts
City, State (County) Madison, WI 53713   (Dane County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents