Similar Projects
800 San Antonio
New Construction, Demolition - 168,550 SF
Conception
$5,000,000 est. value
Palo Alto, CA 94303

Flood Protection - City of San Jose
Infrastructure
Conception
$7,986,000 est. value
San Jose, CA 95134

Costco - Westgate West / San Jose
Demolition, New Construction, Infrastructure - 166,058 SF
Design
$46,000,000 CJ est. value
San Jose, CA 95129

Main Street Milpitas
New Construction, Infrastructure - 350,257 SF
Design
$16,300,000 CJ est. value
Milpitas, CA 95035

PCPA Stagecraft Building Project
New Construction, Addition - 7,789 SF
Post-Bid
$5,732,852 est. value

Positive Location of Underground Utility Facility (Potholing) Services
Infrastructure
Post-Bid
$1,400,000 est. value

SCWP - Site Preparation Project
Infrastructure
Results
Sunnyvale, CA

Lower Alpine Road Retaining Wall Project
Infrastructure
Results
$626,800 CJ est. value
Los Altos Hills, CA 94022

Forest Hill Elementary School Phase One
New Construction
Construction
$4,500,000 est. value
San Jose, CA 95130

Eterna Tower
New Construction, Infrastructure - 1,500 SF
Pending Verification
$37,000,000 CJ est. value
San Jose, CA 95113

Hemlock Avenue Mixed Use Development
New Construction, Infrastructure - 11,910 SF
Pending Verification
$24,000,000 CJ est. value
San Jose, CA 95128

Tully Road Ballfields Dog Park Improvements - City of San Jose
Renovation, Infrastructure
Conception
$500,000 est. value
San Jose, CA 95121

Mountain View Transit Center Grade Separation & Access
Renovation
Design
Mountain View, CA

Construction at Huff Gardens Apartments - Exterior Envelope and Site Improvements
Infrastructure
Post-Bid
$525,000 CJ est. value
San Jose, CA 95128

FHL Sidewalk Repairs, Jolon
Infrastructure
Results
$710,000 CJ est. value
Palo Alto, CA 94306

Last Updated 09/16/2022 06:33 PM
Project Title

Rail Rehabilitation Project Phase 8 Crossovers And Interlockings

Physical Address View project details and contacts
City, State (County) Santa Clara, CA 95050   (Santa Clara County)
Category(s) Heavy and Highway, Transportation
Sub-Category(s) Misc. Structures, Railroad/Subway, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $27,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Only pre-qualified contractors are eligible to bid. The Project will consist of furnishing all labor, materials, tools, equipment, services, supervision, and incidentals necessary to perform rail rehabilitation and replacement at various locations along the VTA light rail system. The scope also includes the installation of new crossovers; associated signaling, communications, overhead contact system, traction power items, ballast/spot tie replacement, and upgrading switches from manual to powered. The Project will also require: Bidder must demonstrate experience in each of the following: (1) special trackwork; (2) overhead contact system; and (3) railroad signaling and be able to apply the best available practices. The minimum experience consists of: 1. Bidder must have completed at least three (3) construction contracts within the last ten (10) years for which Bidder was the prime or direct contractor for the work. 2. Each such completed construction contract must have had a minimum original value of at least $5,000,000. 3. Each such completed construction contract must have had an original contract duration of at least 270 calendar days. 4. Bidders proposed contracting team must have obtained experience in each of (1) special trackwork; (2) overhead contact system; and (3) railroad signaling in the past 10 years through a contract or contracts meeting the requirements of paragraphs 2 and 3 above. The estimated cost of construction for the Project is in the range of $20 million to $27 million, including both the base and bid option scope. The work will include furnishing all labor, supervision, materials, and equipment necessary to construct the Project. Question Submission Deadline:May 13, 2022, 2:00pm *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The estimated time for construction of the Project is 820 calendar days.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows, Special Function Windows, Security Windows, Access Control Hardware, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Directories, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Protective Covers, Transportation Stop Shelters, Flagpoles, Pest Control Devices, Flags and Banners, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Art, Casework, Seating, Multiple Seating, Pews and Benches, Benches.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Packaged Generator Assemblies, Engine Generators, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Site Lighting, Walkway Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Sidewalks, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Tactile Warning Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents