Similar Projects
Deer Creek Plant Improvements - 20600 North Portland Avenue (Ward 8) - City Of Oklahoma City
Renovation
Conception
$1,546,000 est. value
Edmond, OK 73012

Kenwood Hills Water System Improvements- Construction - WL1903 - City of Broken Arrow
Renovation
Conception
$428,000 est. value
Broken Arrow, OK

North Canadian Wastewater Treatment Plant Improvements and Upgrades
Renovation
Bidding
$45,000,000 CJ est. value
Jones, OK 73049

Water Line Improvements
Infrastructure
Bidding
$450,000 CJ est. value
Francis, OK 74844

FY '22 Water Pollution Control Capital Equipment Replacements
Alteration
Post-Bid
Tulsa, OK

Lawton Water SCADA Improvements
Renovation
Post-Bid
$3,500,000 CJ est. value
Lawton, OK 73501

Lawton WWTP Improvements
Renovation
Results
Comanche, OK

Kingfisher WWTP Rehabilitation
Renovation
Results
Kingfisher, OK

Water Supply Improvements for Granite RE Bond Company
Renovation, Infrastructure
Bidding
$1,500,000 CJ est. value
Kellyville, OK 74039

2021 CDBG Wastewater Treatment Improvements
Renovation
Post-Bid
$500,000 CJ est. value
Grandfield, OK 73546

Holdenville Wastewater Treatment Plant Improvements
Renovation
Results
Holdenville, OK 74848

Wastewater Treatment Plant Improvements South Canadian Wastewater Treatment Plant
Renovation, Infrastructure
Post-Bid
$203,529,800 CJ est. value
Oklahoma City, OK 73170

Lynn Lane Wastewater Treatment Plant Disinfection Improvements
Renovation
Results
Broken Arrow, OK 74012

Lynn Lane WWTP Filter Press Replacement Procurement
Renovation
Post-Bid
$1,025,000 est. value
Broken Arrow, OK 74011

Lynn Lane WWTP East Clarifier Rehabilitation
Infrastructure
Results
Broken Arrow, OK 74011

Last Updated 09/26/2022 02:35 PM
Project Title

Water Reclamation Facility Dewatering Centrifuge Replacement - WW0326 - City of Norman

Physical Address View project details and contacts
City, State (County) Norman, OK 73072   (Cleveland County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Construction start expected February 2022
Bids Due View project details and contacts
Estimated Value $2,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In 2009, during the Sludge Management Improvements the Water Reclamation Facility (WRF) installed centrifuges designed to dewater biosolids. These centrifuges are old and have experienced equipment failures requiring expensive repairs . This capital project will replace two existing dewatering centrifuges and related equipment with an updated system. These centrifuges are critical to the NWRF's operation which requires bio-soilds removal on a daily basis. This project is included in the city's 2022-2026 Capital Improvement Program (CIP). As of November 17, 2021, a design engineer has been selected. No firm timeline has been established for bidding and construction. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents