Similar Projects
Pavement Preservation
Infrastructure
Design
$15,717,000 CJ est. value
Mariposa, CA 95338

Pavement Preservation
Infrastructure
Design
$15,717,000 CJ est. value
Mariposa, CA 95338

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Pavement Replacement
Infrastructure
Post-Bid
$280,000 est. value

Cold Plane Asphalt Concrete Pavement and Resurface with HMA and RHMA
Infrastructure
Results
$4,830,000 est. value
CA

Furnish and place Polyester Concrete Overlay on Bridge
Infrastructure
Results
$1,880,000 est. value

Beautification Clean California Project
Infrastructure
Design
$850,000 CJ est. value
Mariposa, CA 95338

RFP D/B - Relocate Callville Bay Water Intake Barge, Lake Mead National Recreational Area
Renovation, Infrastructure
Post-Bid
$5,000,000 CJ est. value
Wawona, CA 95389

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

RFP D/B - Design/Build - Pre-Engineered Metal Storage Building at the Mariposa County Adult Detention Facility
New Construction, Infrastructure
Post-Bid
$3,000,000 CJ est. value
Mariposa, CA 95338

Bell Avenue Complete Street Rehabilitation Project
Infrastructure
Results
$4,163,870 est. value

Concrete Invert Paving and Rock Slope Protection - District 10 Mariposa County
Infrastructure
Post-Bid
$117,100 CJ est. value
Mariposa, CA 95338

Cold Plane Existing Pavement and Resurface With HMA
Infrastructure
Results
$24,985,000 CJ est. value
Mariposa, CA 95338

Minor Roadway Guardrail Repair
Infrastructure
Post-Bid
$70,000 CJ est. value
Mariposa, CA 95338

CA NP YOSE 500(7) Valley-Wide Continuous Flow Intersections
Infrastructure
Results
$5,939,501 CJ est. value
Mariposa, CA 95338

Last Updated 04/07/2023 01:03 PM
Project Title

Quarry Redevelopment

Physical Address View project details and contacts
City, State (County) Mariposa, CA 95338   (Mariposa County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse, Manufacturing/Processing Plant, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $25,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of April 7, 2023, the project is in schematic Design. Architect is on board. Information regarding a General Contractor and method of selection has not been disclosed. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Acre, 146 Acre. 3 Stories Above Grade, New Construction, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates, Screening Devices.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents