Similar Projects
Comprehensive Infrastructure for Tampa's Neighborhoods - Design-Build
Design
Less than $4,362,009 est. value
Tampa, FL 33602

1st and Forest Stormwater Project
Infrastructure
Bidding
Windermere, FL 34786

Polypropylene Pipe for Stormwater
Infrastructure
Bidding
FL

Keystone Drive Nutrient-Separating Baffle Box and Upflow Filter Water Quality Improvement Project
Post-Bid
Less than $862,000 est. value
Orlando, FL 32806

Front Street Complete Streets Project
Post-Bid
Melbourne, FL 32901

South Sewall's Point Road Phase 1
Results
$2,915,034 est. value
Sewall's Point, FL 34996

Sanitary Sewer Cleaning, Inspection and Renewal
Results
Saint Augustine, FL

Desilt and Video
Infrastructure
Bidding
$501,342 est. value

Vacuum Truck Cleaning Services for Underground Stormwater Baffle Boxes
Post-Bid
Winter Haven, FL 33880

Bayou Boulevard, Perry Blount, Avery Outfalls at Bayou Texar Stormwater Treatment Enhancement Project
Results
Pensacola, FL 32502

Stormwater Infrastructure Rehabilitation Services
Infrastructure
Bidding
$4,705,690 est. value
FL

Construction Services
Post-Bid
FL

Stormwater Improvements - Northwest 114th Avenue (Northwest 58th Street - Northwest 50th Street) and Northwest 50th Street (Northwest 114th Avenue - Northwest 112th Avenue)
Results
Less than $892,504 est. value
Doral, FL 33166

Sumter County Storm Sewer Pipe Repair Assessment
Infrastructure
Bidding
Wildwood, FL

Maintenance and Cleaning of Retention Ponds, Ditches, Swales
Term Contract
Post-Bid
Less than $50,000 est. value
FL

Last Updated 09/22/2021 12:24 AM
Project Title

Summit Boulevard - Spanish Trail to Firestone Boulevard Stormwater Treatment Enhancement

Physical Address View project details and contacts
City, State (County) Pensacola, FL 32598   (Escambia County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Spanish Trail has experienced issues with stormwater stacking in the road and creating a hazard driving condition. This is due to the existing stormwater conveyance system being undersized for its contributing basin’s flow. This project will serve to increase the flow capacity of the conveyance system by enlarging curb inlet top and installing a new Stormwater outfall into the Fire Station 3 pit. The focus of the project is twofold. First, to provide additional conveyance capacity for an overtaxed system. Second, if the bid alternate comes in at an affordable price, to provide stormwater treatment for a currently untreated drainage sub-basin. This treatment will be provided by installation of bioretention cells to collect water from the roadway. This project is consistent with current technology for stormwater retrofit treatment and is part of an ongoing program utilized throughout the City to improve water quality of area waterways. As a result of these improvements, work site safety, MOT, maintenance/bypass of stormwater flow, and erosion control will be paramount issues. General work to be accomplished will include installation of new inlet tops, cut and patch of pavement, storm structures, new storm pipe, and sod. The LS Maintenance of Traffic item shall include all signs, devices and other cost associated with maintaining traffic during the project. No night work shall be permitted on this job.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents