Similar Projects
Carkeek CSO Dechlorination System Replacement
Alteration
Design
$860,000 est. value
WA

BRPS Fish Counting Systems
Alteration
Design
$750,000 est. value
WA

Whitman County Public Works Solid Waste Transfer Station Scale Replacement
Renovation
Sub-Bidding
$1,600,000 CJ est. value
Pullman, WA 99163

Seattle Public Schools Audio Visual (A/V) Refresh - Classroom of the Future
Renovation
Sub-Bidding
$284,757 CJ est. value
Seattle, WA 98164

Heavy Wall Meter Boxes and Meter Box Lids
Alteration
Post-Bid
Bellingham, WA 98229

Foreign Object Debris (FOD) Mats
Term Contract, Alteration
Post-Bid
Everett, WA 98201

Northwestern Division Crane Multiple-Award Task Order Contract (MATOC)
Results
$2,000 to $99,900,000 est. value

Northwestern Division Crane Multiple-Award Task Order Contract (MATOC)
Results
$2,000 to $99,900,000 est. value

Brps Fish Counting Systems
Term Contract
Design
$750,000 est. value
WA

Ductile Iron Pipe, Fittings, Couplings, Pipe Restraints and Grip Rings
Term Contract, Alteration
Post-Bid
Bellingham, WA 98229

Marine Cell Fender Procurement Berth 17
Infrastructure
Results
$176,250 to $194,785 est. value
Vancouver, WA 98687

Spokane Airport Board - Fuel Control Facility Metering Upgrade
Renovation
Design
$70,000 CJ est. value
Spokane, WA 99224

Snow Removal Equipment
Infrastructure
Post-Bid
WA

Gorbel 1-Ton Gantry Crane "Off-The-Shelf" Or An Approved Or-Equal
Alteration
Results
Less than $8,000 est. value
Spokane, WA

Tractor with Side Mount Mower
Term Contract
Post-Bid
WA

Last Updated 09/12/2022 01:10 PM
Project Title

Centrifuge Polymer

Physical Address View project details and contacts
City, State (County) Longview, WA 98632   (Cowlitz County)
Category(s) Single Trades
Sub-Category(s) Equipment
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Work Consists of Centrifuge Polymer, that will be used as a dewatering aide for dewatering blended sludge consisting of primary and thickened waste activated sludge s ranging in concentration between 3.0% - 7.0% for a 12-month period that is anticipated to begin on November 1, 2022 and ending October 31, 2023. The contract may be extended for an additional 12-month period at the mutual agreement of both parties. Performance for the Centrifuge Polymer is required to average 22% TS Cake or higher and 0.6% TS Centrate or lower in the daily field test. Bidders must be conduct a jar test and a subsequent 8-hour full-scale performance test prior to the bid opening date. The low bid will be determined based on the lowest cost per dry ton of dewatered sludge. All bids must remain open for a period of 30 calendar days after the 12th day of October, 2022. The Three Rivers Regional Wastewater Authority reserves the right to reject any and all bids, to waive the informalities, and to contract as the best interest of the Three Rivers Regional Wastewater Authority may appear.

Details

Division 11 - Equipment, Operation and Maintenance of Equipment, Vehicle Service Equipment, Maintenance Equipment, Unit Kitchens, Residential Equipment, Residential Appliances, Agricultural Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents