Similar Projects
Animal Shelter - CMU1908 - City of Sugar Land
New Construction, Infrastructure
Conception
$8,750,000 CJ est. value
Sugar Land, TX 77478

Emergency Operations Center/Public Safety Dispatch Building - CMU2301 - City of Sugar Land
New Construction, Infrastructure
Conception
$11,500,000 CJ est. value
Sugar Land, TX 77479

Orchestra Room Additions at Briscoe JHS, Foster HS, Reading JHS, George Ranch HS, Leaman JHS, and Fulshear HS
Addition, Demolition, Infrastructure - 4,400 SF
Design
$6,300,000 CJ est. value
Richmond, TX 77469

Sugar Land Regional Airport Runway 17/35 Rubber Removal and Paint Markings
Infrastructure
Design
$50,000 CJ est. value
Sugar Land, TX 77498

Collection System Rehabilitation Project E (Package #1 - CIPP)
Infrastructure
Bidding
$1,900,000 CJ est. value
Sugar Land, TX 77479

Collection System Rehabilitation Project E (Package #1 - CIPP)
Infrastructure
Bidding
$1,900,000 CJ est. value
Sugar Land, TX 77479

Mustang Bayou Wastewater Treatment Plant Expansion and Rehabilitation Project
Addition, Demolition, New Construction, Renovation, Infrastructure
Post-Bid
$6,600,000 CJ est. value
Fresno, TX 77545

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Roadway Construction to Serve Sienna Village of Destrehan Section 1 - Internal
Infrastructure
Results
$2,506,560 CJ est. value
Missouri City, TX 77489

Water, Sanitary Sewer, and Drainage Facilities to Serve Sienna Section 52
Infrastructure
Results
Katy, TX

Lake Olympia at Vicksburg / The Shops at Lake Olympia
New Construction, Infrastructure - 17,400 SF
Construction
$1,479,000 CJ est. value
Missouri City, TX 77489

Cullinan Park Phase Two Improvements
Infrastructure
Construction
$1,415,908 CJ est. value
Sugar Land, TX 77498

WhiteWater Express Car Wash / Richmond
New Construction, Infrastructure - 4,167 SF
Pending Verification
$1,600,000 CJ est. value
Richmond, TX 77406

Candela South Water and Wastewater Plant Facilities
New Construction, Infrastructure
Pending Verification
$300,000 CJ est. value
Richmond, TX 77469

The Shed Mixed-Use / Missouri City
New Construction, Infrastructure
Conception
$8,000,000 CJ est. value
Missouri City, TX 77459

Last Updated 09/06/2023 05:35 AM
Project Title

Covington West and Imperial Woods Covington Woods Drainage Improvements

Physical Address View project details and contacts
City, State (County) Sugar Land, TX 77498   (Fort Bend County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $4,100,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This contract is contingent upon release of funds from the Texas Water Development Board (TWDB). Any contract or contracts awarded under this Invitation to Bid is expected to be funded in part by a loan or grant from the Texas Water Development Board. Neither the state of Texas, nor any of its departments, agencies, or employees are or will be a party to this Invitation to Bid or any resulting contract. Any contract(s) awarded under this Invitation to Bid is subject to the United States Iron and Steel (US I&S) requirements of Texas Water Code 17.183 and/or Texas Government Code, Chapter 2252, Subchapter F, as amended by SB 1289, 85th Legislative Session, as applicable. The Selected Bidder(s) will be required to enter into the City of Sugar Land s Standard Contract for Civil Engineering Construction Projects and provide and maintain the minimum insurance coverages required under the contract. The contract is including within this ITB. Questions regarding this bid must be received by Mr. Matt Manges, PE, CFM on or before 5:00 p.m. on August 30, 2023. Please contact Mr. Matt Manges, PE, CFM at 713-821-0366 (office) or email: MJManges@lan-inc.com. The City does not assume responsibility for not receiving questions from the Bidder or the Bidders receipt of any answers, addenda, or amendment. The City Council will award the contract as provided in the Invitation to Bid. The City of Sugar Land will give notice of the contract award within ninety (90) calendar days after the opening date and time.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents