Similar Projects
On-Call Construction Services for the Utilities Department
Term Contract
Bidding
Rio Rancho, NM

Visitors Center Pedestrian and Trailhead Improvements NMDOT Highway Safety Improvements Program Project
Infrastructure
Bidding
Silver City, NM

Copper King Trail Improvements
Post-Bid
Red River, NM 87558

Sunland Park Street Paving and Sidewalk Construction On-Call
Post-Bid
Sunland Park, NM 88063

Senior Center Service Access Parking Lot Reconstruction
Results
Las Vegas, NM

Construction of the Tyrone Townsite ADA Improvements
Results
Silver City, NM

National Avenue/Bridge Street Improvements
Infrastructure
Bidding
Las Vegas, NM 87701

Sidewalk and Retaining Wall Installation
Post-Bid
Chinle, Red Valley, Window Rock, AZ - Nageezi, Pinedale, Sanostee, Tohatchi, NM 86515

Visitors Center Pedestrian and Trailhead Improvements NMDOT Highway Safety Improvements Program
Results
Silver City, NM 88061

Parking Area
Post-Bid
Taos, NM 87710

Eva B Stokely Elementary Asphalt Parking Lot
Results
Shiprock, NM 87420

Administrative Complex Parking Lots and Sheep Springs Way Improvement
Post-Bid
Jemez Pueblo, NM 87024

San Ysidro Walkway
Results
San Ysidro, NM 87053

On Call Construction Services for Public Works
Term Contract
Post-Bid
Less than $2,500,000 est. value
Los Alamos, NM 87544

Construction Services for 2nd Street Trail Phase 2
Results
Less than $873,566 est. value
Albuquerque, NM 87102

Last Updated 06/14/2021 12:26 PM
Project Title

North Atkinson Avenue (NM 256) Rehabilitation

Physical Address View project details and contacts
City, State (County) Roswell, NM 88202   (Chaves County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $1,300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project will consist of the removal of approximately 3 of existing asphalt surfacing and 9 of excavation. It will be replaced with 6 of new base course and 6 of HMA SP-IV. The sidewalk will be repaired in various areas throughout the project and tied to the existing as well as building new sidewalk in areas where the sidewalk is missing. There will also have new permanent signing throughout.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents