Similar Projects
Thomas Metcalf School Replacement - Illinois State University
Demolition, New Construction, Infrastructure
Conception
$74,459,972 CJ est. value
Normal, IL 61790

University High School Replacement - Illinois State University
Demolition, New Construction, Infrastructure
Conception
$82,297,800 CJ est. value
Normal, IL 61761

Outbound Charging Station Substation Foundation / Rivian Automotive
New Construction, Infrastructure
Design
$706,965 CJ est. value
Normal, IL 61761

QuikTrip / Bloomington
New Construction, Infrastructure - 8,000 SF
Design
$4,000,000 CJ est. value
Bloomington, IL 61705

Bituminous Material
Infrastructure
Bidding
$300,000 CJ est. value
Gridley, IL 61744

Bituminous Material
Infrastructure
Bidding
$300,000 CJ est. value
Gridley, IL 61744

Sealcoat
Term Contract
Sub-Bidding
Gridley, IL 61744

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

2022 Ground Maintenance of Public Park
Alteration
Post-Bid
Colfax, IL

Meadows Road (CH 23) Road Reconstruction
Infrastructure
Results
IL

2022 Non-MFT Construction Sections
Infrastructure
Results
IL

Heartland Community College - Agriculture Complex
New Construction, Infrastructure - 30,322 SF
Construction
$16,300,000 CJ est. value
Normal, IL 61761

Wonsook Kim College of Fine Arts Renovation
Demolition, New Construction, Infrastructure, Renovation
Pending Verification
$67,300,000 CJ est. value
Normal, IL 61761

Wonsook Kim College of Fine Arts Renovation
Demolition, New Construction, Infrastructure, Renovation
Pending Verification
$67,300,000 CJ est. value
Normal, IL 61761

Constitution Trail Extension - Lafayette Street to Hamilton Road - 40100100-70051 - City of Bloomington
Infrastructure
Conception
$320,000 CJ est. value
Bloomington, IL 61704

Last Updated 06/23/2023 03:04 PM
Project Title

Bituminous Surface Treatment

Physical Address View project details and contacts
City, State (County) Le Roy, IL 61752   (McLean County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

City/County - LeRoy Bituminous surface treatment of various City streets with a final fog seal. Milling and HMA paving at intersections of Chestnut St @ Hemlock St and Chestnut St @ Sunset Dr. Crack and joint sealing at the intersection of Chestnut St @ Sunset Dr. Bituminous Materials (Cover and Seal Coat); CRS-2; Furnish & Apply; 92 Tons Seal Coat Aggregate; CA-16 Pea Gravel; Furnish & Apply; 680 Tons Bituminous Materials (Fog Seal); NTEA; Furnish & Apply; 46 Tons Surface Removal (Special); Furnish & Apply; 880 Sq Yds Bituminous Materials (Tack Coat); Furnish & Apply; 44 Pounds Hot-Mix Asphalt Surface Course IL-9.5 Mix "C" N50; Furnish & Apply; 100 Tons Joint or Crack Routing (PC Concrete Pavement and Shoulder); Furnish & Apply; 3500 Feet Joint or Crack Filling; Furnish & Apply; 1050 Pounds Project Location: Various streets in the City of Le Roy Proposals requiring prequalification of bidders will be issued only to those contractors who are qualified with the Department of Transportation. Prequalification forms may be secured from the Engineer of Construction, Administration Building, 2300 South Dirksen Parkway, Springfield, IL 62764. ILDOT - Bituminous Surface Treatment - 23-00000-00-GM

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents