Similar Projects
Police Academy Improvements - BL095 - City of Des Moines
Addition, Demolition, Build-out, Renovation, Infrastructure
Conception
$850,000 CJ est. value
Des Moines, IA 50315

Roadway Reconstruction - Fleur Drive - ST267 C038EG - City of Des Moines
Infrastructure
Conception
$15,231,289 CJ est. value
Des Moines, IA 50321

Central Campus Multipurpose
Renovation, Infrastructure
Design
$921,000 CJ est. value
Des Moines, IA 50309

Northglen Stream Improvements - City of Johnston
Infrastructure
Design
$400,000 CJ est. value
Johnston, IA 50131

Readiness Center and SE Fire Station and Training Facility
LEED Certification, New Construction, Infrastructure - 114,004 SF
Post-Bid
$5,250,000 CJ est. value
West Des Moines, IA 50265

2022 Prairie Ridge Aquatic Center - Resurfacing Project
Renovation, Infrastructure
Post-Bid
$225,000 CJ est. value
Ankeny, IA 50023

Des Moines Levee Alterations - Phase C
Infrastructure
Results
$14,200,000 est. value
Des Moines, IA 50982

Animal Control Facility Bid Package No. 2 - Grading, Utilities and Public Improvements (Streets)
Renovation, Infrastructure - 21,900 SF
Results
$870,000 est. value
Des Moines, IA 50317

Olive Garden / Des Moines
New Construction, Infrastructure - 6,489 SF
Construction
$2,500,000 CJ est. value
Des Moines, IA 50320

The Lab
New Construction, Infrastructure
Construction
$21,260,000 CJ est. value
Des Moines, IA 50309

Kum & Go Grand Avenue and Raccoon River Drive / West Des Moines
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
West Des Moines, IA 50266

Homewood Suites by Hilton / Urbandale
New Construction, Infrastructure - 61,200 SF
Pending Verification
$18,000,000 CJ est. value
Urbandale, IA 50322

Easton Boulevard - University Avenue - Four Mile Creek - ST263 C038EG - City of Des Moines
Infrastructure
Conception
$1,561,369 CJ est. value
Des Moines, IA 50309

Northglen Trail Replacement - City of Johnston
Infrastructure
Design
$400,000 CJ est. value
Johnston, IA 50131

Principal Park Master Plan - Phase 1 Improvements
Addition, Demolition, Renovation, Infrastructure - 14,000 SF
Post-Bid
$5,218,000 CJ est. value
Des Moines, IA 50309

Last Updated 05/09/2023 12:38 PM
Project Title

RFQ Construction Manager at Risk - Des Moines International Airport Future Terminal Construction REBID

Physical Address View project details and contacts
City, State (County) Des Moines, IA 50321   (Polk County)
Category(s) Heavy and Highway, Transportation
Sub-Category(s) Airline/Passenger Terminal, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected September 2024
Bids Due View project details and contacts
Estimated Value $530,000,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

https://www.keloland.com/top-stories/faa-awards-10-8-million-for-new-des-moines-airport-terminal/ DES MOINES, Iowa – The Des Moines International Airport is getting $10.8 million from the Federal Aviation Administration to help with improvements and construction of a new terminal. The federal funds are part of nearly $1 billion from the Biden Administration’s Bipartisan Infrastructure Law. The U.S. Department of Transportation announced the money will benefit 99 airports across the country and will help improve security, airport access, and build or improve terminals. The money coming to the Des Moines International Airport will go toward replacing a terminal that was built in 1948 and the FAA says is beyond its useful life and operating above capacity. Over the first two years of the Bipartisan Infrastructure Law, the U.S. DOT said the Des Moines International Airport is getting a total of $15.8 million to pay for the preparation and construction ________________________________________________________________________________________________________________________________ https://www.saltwire.com/nova-scotia/business/us-awards-nearly-1-billion-to-airports-in-infrastructure-grants-100828696/ The awards include $10.8 million to Des Moines International Airport in Iowa to replace the 1948 terminal that is operating above capacity and $29 million to Salt Lake City International Airport in Utah for a terminal and concourse redevelopment program. This is the second phase of funding - the FAA awarded nearly $1 billion for airport terminal projects announced for 85 airports last year. ____________________________________________________________________________________________________________________________________ https://newsadvance.com/news/national/inflation-taking-bite-out-of-new-infrastructure-projects/article_9bf36f5b-8c3d-535f-9d32-0fba8b2d796e.html The price of a foot of water pipe in Tucson, Arizona: up 19%. The cost of a ton of asphalt in a small Massachusetts town: up 37%. The estimate to build a new airport terminal in Des Moines, Iowa: 69% higher, with a several year delay. Officials at Des Moines International Airport were counting on the federal infrastructure money to replace an aging terminal with a modern structure. Four years ago, a new 14-gate terminal was projected to cost about $434 million and be open by 2026. By this spring, the cost had soared to $733 million. That's more than the airport can afford, even with the federal aid. So officials are planning to break the project into phases, building just five new gates by 2026 at a cost of $411 million. "If inflation continues, it may be a decade before the project gets completely done," airport Executive Director Kevin Foley said. Other projects also have been rocked by inflationary price hikes. _____________________________________________________________________________________________________________________________ The Des Moines Airport Authority (Authority) will be publishing a request for statements of qualifications (RFQs) for Construction Manager at Risk (CMR) services to provide Construction services for its future terminal construction project at the Des Moines International Airport. The future terminal project is planned as a multi-year project to replace all or part of the existing terminal. The future terminal will be located on the existing Des Moines International Airport campus, 5800 Fleur Drive, Des Moines, IA 50321.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows, Special Function Windows, Security Windows, Access Control Hardware, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Directories, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Protective Covers, Flagpoles, Pest Control Devices, Flags and Banners, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Art, Casework, Seating.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Packaged Generator Assemblies, Engine Generators, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Site Lighting, Walkway Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Tactile Warning Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents