Similar Projects
The Link Apartments
New Construction
Conception
$80,000,000 est. value
Oakland, CA 94607

Affordable Micro Studios
Renovation - 320,000 SF
Conception
$18,500,000 est. value
Oakland, CA 94607

Telegraph Tower
New Construction - 905,000 SF
Design
$10,000,000 CJ est. value
Oakland, CA 94612

San Pablo Avenue Affordable Housing
New Construction - 27,000 SF
Design
Emeryville, CA 94608

Contractor - Housing Project No. 2 - Prequalification of Bid Packages
New Construction
Post-Bid
$240,000,000 est. value
Berkeley, CA

The Launch Apartments
New Construction
Construction
$166,000,000 est. value
Alameda, CA 94501

Glo Yoga Studio
Build-Out - 1,601 SF
Construction
$315,000 est. value
Livermore, CA 94551

Oakland A's Stadium & Mixed-Use Development
New Construction - 550,000 SF
Pending Verification
$10,000,000 CJ est. value
Oakland, CA 94607

500 Lake Park Mixed Use Development
New Construction - 3,000 SF
Pending Verification
$500,000 to $1,000,000 CJ est. value
Oakland, CA 94610

Admirals Cove Additional Units
Addition - 262,815 SF
Conception
Alameda, CA 94501

2400 Adeline Condominium Development
New Construction - 45,750 SF
Design
$4,600,000 est. value
Oakland, CA 94607

Studio 2000
New Construction, Demolition - 43,567 SF
Construction
$10,000,000 est. value
Berkeley, CA 94704

Mixed-Use Building
New Construction - 57,600 SF
Pending Verification
$5,313,535 est. value
Berkeley, CA 94704

Downtown Oakland Housing Tower
Renovation
Conception
Oakland, CA 94612

Lake Merritt Bart Station
New Construction - 516,500 SF
Design
Oakland, CA 94607

Reported 05/23/2022 02:42 PM
Project Title

Apartment Building and Fitness Center

Physical Address View project details and contacts
City, State (County) Alameda, CA 94502   (Alameda County)
Category(s) Entertainment/Recreation, Residential
Sub-Category(s) Apartments/Condominiums, Fitness Center
Contracting Method Bids by Invitation.
Project Status Conceptual Design
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Fitness Center, 25,000 SF New Construction, Apartments/Condominiums, New Construction, 400 Unit(s).
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Mirrors, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Specialty Flooring, Carpeting, Acoustic Treatment, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers.
Division 11 - Equipment, Residential Equipment, Residential Appliances, Athletic Equipment, Exercise Equipment.
Division 12 - Furnishings, Rugs and Mats.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents