Last Updated | 02/01/2023 10:05 AM |
Project Title | Construction of a Water Treatment Plant - Sub |
Physical Address | View project details and contacts |
City, State (County) | Amherst, MA 01002 (Hampshire County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant, Site Development, Storage/Water Tanks, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected March 2023 |
Bids Due | View project details and contacts |
Estimated Value | $3,291,138 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | ** As of February 1, 2023 this project has not yet been awarded. A timeline or award has not yet been established.** Custom BT MASONRY FILED SUB -Cantarella & Son, Inc. $ 160,000 MISCELLANEOUS AND ORNAMENTAL IRON FILED - SMJ Metal Company, Inc. $ 137,440 WATERPROOFING, DAMPPROOFING AND CAULKING FILED SUB - Superior Caulking & Waterproofing Co., Inc. $ 149,000 PAINTING FILED SUB - Keltic Painting LLC $ 125,720 FIRE PROTECTION SPRINKLER SYSTEMS FILED SUB - Carlysle Engineering, Inc. $ 398,270 PLUMBING FILED SUB - Waterline Industries Corporation $ 147,677 HEATING, VENTILATION, AND AIR CONDITIONING FILED SUB - Waterline Industries Corporation $ 327,677 ELECTRICAL FILED SUB - Waterline Industries Corporation $ 1,677,677 Construction of a 1.5 mgd water treatment plant for the existing surface water supply. The WTP will utilize coagulation, mixing, flocculation, dissolved air floatation, dual media filtration including granular activated carbon above sand, chlorine contact tank and clearwell, and chemical feed systems. Building components including HVAC, plumbing, fire sprinkler system, and electrical services shall be incorporated in the WTP. Other work includes demolition of the existing water treatment facility, site work with exterior piping, connection to the sanitary sewer system, below ground tanks, and stormwater collection systems. All work shall be completed within 730 consecutive calendar days of the date fixed in the Notice to Proceed. Disadvantaged Business Enterprise (DBE) goals are applicable to the total amount paid for the construction contract. The goals for this project are a minimum of 4.2 percent D/MBE participation and 4.5 percent D/WBE participation by certified DBEs. Each bid and sub-bid shall be accompanied by a bid security in the amount of 5% of the total bid amount. A Performance Bond and Labor and Materials Payment Bond, each in the amount of 100% of the Contract Price, will be required. Massachusetts Minimum Wage Rates as well as Federal Minimum Wage Rates apply to this project. This project is being funded in part by the Massachusetts Clean Water Trust (the "Trust"). Only bids submitted by prequalified bidders in accordance with M.G.L. c. 149, Section 44D 1/2 , subsections (a) to (j) inclusive, and sub-bids submitted by prequalified sub-bidders in accordance with M.G.L. c. 149, Section 44D 3/4 , subsections (a) to (j) inclusive, will be accepted. Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Sub Bid Category Masonry; Miscellaneous and Ornamental Iron; Waterproofing, Dampproofing, and Caulking; Painting; Fire Protection Sprinkler Systems; Plumbing; Heating, Ventilation, and Air conditioning; and Electrical |
||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |