Similar Projects
72-Inch Water Main in West 2nd Avenue Between 11th Street and 13th Street
Bidding
Less than $8,142,405 est. value
Hialeah, FL 33010

CDBG Drainage Improvements and Water Main Installation
Bidding
$1,971,586 est. value
FL

450 Fire Hydrant Meter 3
Post-Bid
Homestead, FL 33030

Advanced Metering Infrastructure (AMI)
Post-Bid
Sarasota, FL 34230

Downtown Utility Replacements
Results
Less than $740,000 est. value
Dunnellon, FL

F--Water Chlorine, Bldg Monitoring
Results
Orlando, FL 32827

Hill-N-Dale Water Main Replacement
Bidding
FL

Construction Services for Veranda Preserve West Phase 2 Infrastructure Improvements
Post-Bid
Port Saint Lucie, FL 34953

Regional Integrated Loop System Phase 3B Interconnect (Preymore to SR 72)
Results
$12,092,815 est. value
FL

Essex Avenue, Steven Street and Scenic Way Watermain Extension Project
Bidding
$1,137,500 est. value
Citrus Hills, Hernando, FL 34442

Teak Follow Boulevard North, Phases 1 and 2
Post-Bid
San Antonio, FL 33576

Water Main Improvements: 31st, 32nd, 33rd, 34th and 35th Streets
Results
West Palm Beach, FL

Installation of 96 inch Butterfly Valve on Hialeah WTP Raw Water Main
Bidding
$1,341,166 est. value
Miami, FL 33134

Design/Build Project - Water and Wastewater Distribution Systems and Rail Switches Improvements
Post-Bid
Callahan, FL 32011

FFY2018 CDBG Neighborhood Revitalization Project
Results
Less than $700,000 est. value
Milton, FL

Last Updated 01/08/2021 08:42 AM
Project Title

SRF Water Main Replacements, Phase 3

Physical Address View project details and contacts
City, State (County) Hawthorne, FL   (Alachua County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,225,200
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of constructing approximately 800 LF of 2" PVC water main; 10,600 LF of 6" PVC/FPVC water main (conventional excavation/directional drill); 3,600 LF of 8" PVC/FPVC water main (conventional excavation/directional drill); 4,600 LF of 10" PVC/FPVC water main (conventional excavation/directional drill); fire hydrants; connection to existing mains; cutting, capping, and/or grout filling existing mains for abandonment; replacement of existing water services; installation of new water services; and associated restoration. Project funding will be from a combination of FDEP Drinking Water State Revolving Funds and the St. Johns River Water Management District Cooperative Cost-Share Initiative Program.

Details

Division 31 - Earthwork, Excavation and Fill, Excavation.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Distribution Fire Hydrants, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents