Similar Projects
Undergrounding of Beach Electrical Services
Bidding
Dania Beach, FL 33004

General Electrical Services
Term Contract
Bidding
Lauderdale Lakes, FL

Main Uninterruptible Power Supply (UPS) Replacement Project
Post-Bid
Less than $90,000 est. value
Fort Lauderdale, FL 33309

Broward Operations Center Primary Voltage Cable Replacement Building # 4907
Post-Bid
Less than $54,000 est. value
Fort Lauderdale, FL 33309

Lift Stations 16A, 34, 37 and 2E Generators
Results
Less than $576,000 est. value
Tamarac, FL

Well 19 Mechanical and Electrical Equipment Replacement
Results
Less than $370,000 est. value
Deerfield Beach, FL 33441

Headquarters Main Uninterruptible Power Supply (UPS) Replacement
Post-Bid
Fort Lauderdale, FL 33309

Emergency Operations Center New Generators
Results
Less than $1,304,088 est. value
Fort Lauderdale, FL 33324

Diagnostic and Repair Services Caterpillar Generators
Post-Bid
Fort Lauderdale, FL 33301

Inspection, Maint, Repair and Replacement of Uninterruptible Power Supply (UPS) Systems Equipment
Results

Testing and Repair of Hydroelectric Generator Governor Systems at Hydroelectric Facilities for the U.S. Army Corps of Engineers
Post-Bid

Automatic Transfer Switch Addition
Results
Hollywood, FL 33025

Strobe/Led Lights: Flat and Pipe Mount
Term Contract
Post-Bid

RWWTP Deep Well Injection Generator Housing
Results
Plantation, FL 33317

Residential Generator Purchase And Installation Services
Post-Bid
Hollywood, FL 33024

Reported 02/24/2021 12:00 AM
Project Title

Purchase and Install UPS Equipment for City Center EOC

Physical Address View project details and contacts
City, State (County) Pembroke Pines, FL 33025   (Broward County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $150,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. Contractor shall provide and install new UPS and supplementary equipment connections at City Hall per the attached engineered drawings and specifications to include reinforcement of the floor where the UPS is to be located. Details on the scope of work are included in Attachment H and Attachment I. 2. Contractor is responsible for verifying all field measurements and conditions. 3. All equipment must be installed as per all governing code requirements.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents