Similar Projects
NCWRF and SCWRF Structural Assessments and Repairs
Renovation
Bidding
Columbus, GA 31904

Wastewater Treatment Facility Improvements
Renovation
Bidding
Abbeville, GA

Bioxide Odor and Corrosion Control
Term Contract
Post-Bid
Savannah, GA 31400

Membrane Replacement on Anaerobic Digester Covers Water Pollution Control Plant
Post-Bid
Milledgeville, GA

NOWRF and MOWRF Tertiary Filtration
Results
Athens, GA

Interstate Centre WWTF and LAS Expansion
Renovation, Addition
Results
Richmond Hill, GA 31324

Middle Oconee WRF Maintenance Building
New Construction
Construction
Less than $1,345,000 est. value
Athens, GA 30606

South Primary Clarifier Rebuild Wastewater Treatment Plant - Labor Only
Renovation
Bidding
Milledgeville, GA

USDA Sewer System Improvements
Post-Bid
Thomaston, GA

Intrenchment Creek WRC Decommission and South River Wrc Primary Clarifiers Replacement
Results
Atlanta, GA 30303

SCWRF Vent and Flare System
New Construction
Post-Bid
Columbus, GA 31901

Indian Creek WRF Copper Removal System
Results
Madison, GA 30650

Flat Creek WRF Clarifier Renovation
Renovation
Post-Bid
Gainesville, GA 30504

Water Reclamation Facility Improvements - Addition of 2 Clarifiers
Results
Less than $2,300,000 est. value
Hoschton, GA 30548

North Oconee WRF and Middle Oconee WRF Improvements
Renovation
Post-Bid
$23,000,000 to $26,000,000 est. value
Athens, GA 30605

Last Updated 12/15/2021 09:33 AM
Project Title

Progressive Design-Build Services W.B. Casey WRRF Biosolids Facilities Upgrade

Physical Address View project details and contacts
City, State (County) Jonesboro, GA 30238   (Clayton County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $100,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project will include the planning, design, construction, commissioning, and startup necessary to place the Project in full operation according to requirements contained herein. The Project is to be designed and constructed in two phases using the progressive design-build delivery method, as follows: • Phase 1 Services (preconstruction phase): Prepare design to 60-percent complete, as described in Exhibit C of the Draft Progressive Design-Build Agreement (Agreement) (Scope of DesignBuilder Services), and prepare a Phase 2 Services Proposal including a Guaranteed Maximum Price (GMP), or lump sum price proposal if requested by the Owner, for consideration by the Owner; and • Phase 2 Services (final design and construction phase): Complete design, construction, and postconstruction tasks, including performance testing, startup commissioning, and operator training and support.

Details

Sewage Treatment Plant, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents