Similar Projects
Aurora Signals 2019
Bidding
Less than $1,000,000 est. value

Wrong Way Driving Traffic Control Enhancement Phase 1 Consisting of Signing, Signal Headupgrades and Pavement Markings
Post-Bid
$1,000,000 to $5,000,000 est. value

Traffic Signal Replacement
Results
$1,000,000 to $5,000,000 est. value

Wrong Way Driving Traffic Enhancements
Results
$1,000,000 to $5,000,000 est. value

South Federal Boulevard and West Berry Avenue Pedestrian Traffic Signal SRTS
Results
Littleton, CO

Signal Replacement with Curb Ramps and Minor Signing and Striping
Results
$1,000,000 to $5,000,000 est. value

Stop Bar Vehicle Detection for Signalized Intersections
Post-Bid
Centennial, CO

Replacement of Traffic Signal Cabinets, Traffic Signal Controllers, and Installation of Advanced Detection at Various Locations in Region 1
Results
$1,000,000 to $5,000,000 est. value

RFI 20-082 MM Automated Traffic Management System (ATMS)
Post-Bid

Porteos Filing No. 3, 64Th Avenue (South Side) At Jackson Gap Street Streetlights & Porteos No. 2, 56Th Avenue And Powhaton Road Streetlights
Post-Bid
Greenwood Village, CO

Chambers Road and Innovation Way Traffic Signal
Results
CO

2020 Traffic Signal Cleaning and Painting
Post-Bid
Greenwood Village, CO 801123

Traffic Signal Pole Replacement
Results
Less than $174,555 est. value
Centennial, CO 80112

Rebuilding the Signals in Three Different Locations
Results
$1,000,000 to $5,000,000 est. value

Walden and 104th Traffic Signal
Results
Less than $500,000 est. value
Centennial, CO

Last Updated 08/11/2020 04:01 PM
Project Title

Batch Signal Construction Phase 2

Physical Address View project details and contacts
City, State (County) Centennial, CO 80112   (Arapahoe County)
Category(s) Heavy and Highway
Sub-Category(s) Traffic Signalization
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $623,227
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project shall include all labor, equipment and materials necessary to install new traffic signals at the intersections of S Colorado Blvd / E Nobles Rd / E Easter Ave and S Himalaya St / S Gibraltar Way. Note that the new signal poles and mast arms, including signal pole anchor bolts, have already been purchased by the City and are “install only” items in this contract

Details

Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents