Similar Projects
Roadway Minor Rehab
Infrastructure
Conception
$550,028 CJ est. value
Perrysville, OH 44864

SR 302 - Bridge Preservation
Infrastructure, Renovation
Design
$2,805,000 CJ est. value
Ashland, OH 44805

SR 42 Roadway Minor Rehab
Infrastructure
Design
$3,851,649 CJ est. value
Ashland, OH 44805

Bridge Replacement (1 Bridge)
Demolition, New Construction, Infrastructure
Bidding
$1,275,533 CJ est. value
Ashland, OH 44805

Bridge Replacement (1 Bridge) - SR 96
Demolition, New Construction, Infrastructure
Bidding
$2,705,000 CJ est. value
Clear Creek Township, OH 44805

Jacking and Boring Services
Infrastructure
Post-Bid

Box Culverts
Infrastructure
Post-Bid

Culvert Replacement - ASD/HUR-US 250/SR 13-24.67/02.47
Infrastructure
Results
$530,000 est. value

Freer Field Parking Lot Construction Project
Infrastructure
Results
$251,380 CJ est. value
Ashland, OH 44805

Roadway Major Rehab - US 545
Infrastructure
Design
$12,350,000 CJ est. value
Ashland, OH 44805

RM FY2023 - Spot Patching / Pavement Repair
Infrastructure
Bidding
$2,000,000 CJ est. value
Ashland, OH 44805

Concrete Pipes
Infrastructure
Post-Bid

Ashland County Asphalt Concrete Paving Program
Infrastructure
Results
$480,000 CJ est. value
Ashland, OH 44805

Bridge Preservation - US 511
Infrastructure
Design
$350,000 CJ est. value
Ashland, OH 44805

2023 Street Resurfacing
Infrastructure
Bidding
$323,000 CJ est. value
Loudonville, OH 44842

Last Updated 04/28/2023 11:04 AM
Project Title

D03 FY2021 (B) Bridge Repair

Physical Address View project details and contacts
City, State (County) Ashland, OH 44805   (Ashland County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $436,036 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Bridge Repairs RIC US 0042 16.32 (Over Flemming Falls Creek)RIC SR 0430 02.19 (Over Touby Run)RIC SR 0430 05.35 (Over Ritter's Run) As of December 20, 2022, the project is in design status. Anticipated letting date is April 13, 2023. OHDOT - D03 FY2021 (B) Bridge Repair Each bidder is required to file with his bid a certified check or cashiers check for an amount equal to five percent (5%) of its bid, but in no event more than fifty thousand dollars, or a bid bond for ten percent (10%) of its bid payable to the Director of Transportation. The successful bidder must furnish a performance bond and a payment bond in an amount equal to one hundred percent (100%) of the awarded contract amount. *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. Date Set for Completion: 10/27/2023 Goal for female workers is 6.9% DBE Goal: 7.0%

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents