Similar Projects
Grand Rapids Heating Upgrade
Bidding
Grand Rapids, MN 55744

Multiple HVAC Equipment Replacement Units
Bidding
Saint Paul, MN 55119

HVAC Filters
Term Contract
Post-Bid
Anoka, MN 55303

MBC - Alerton Controls Services
Term Contract
Post-Bid
Minneapolis, MN

HVAC System Replacement
Results
Grand Rapids, MN 55744

HVAC Upgrades
Results
Minneapolis, MN 55411

Building 25 Dehumidification - Minnesota Veterans Home Hastings
Bidding
$113,270 est. value
Hastings, MN 55033

Filter Replacement Services at PHA Properties
Post-Bid
Saint Paul, MN

Crooked Lake ES HVAC Replacement and Deferred Maintenance Phase 2
Results
Andover, MN 55304

Data Room Cooling at the Judicial Building
Bidding
$103,036 est. value
MN

F108--Chemo Hood Vent Decontamination and Disposal St. Cloud
Post-Bid
Saint Cloud, MN

Franklin Elementary School HVAC Improvements 2020
Results
Mankato, MN 56001

Braemar Ice Arena Dehumidification Upgrade
Renovation
Bidding
$240,000 est. value
Edina, Minneapolis, MN

Natatorium HVAC
Post-Bid
Rochester, MN

Washington Elementary School HVAC Improvements
Results
Mankato, MN 56001

Last Updated 02/09/2021 04:16 PM
Project Title

Johnson High School HVAC Replacement

Physical Address View project details and contacts
City, State (County) Saint Paul, MN 55106   (Ramsey County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of replacement of the majority of the existing HVAC systems currently serving the school. The replacement of HVAC system will include air handling units, fans, ventilation hoods, unit heaters, and baseboard radiation. Existing classroom unit ventilators will be removed and these rooms will now be served from new air handling units. VAV boxes with reheat coils will now serve most occupied spaces. The project includes the installation of a geothermal heat pumps system and a vertical well field to provide air conditioning and heating for the school along with a high efficiency condensing boiler for supplemental heat. New ceilings will be installed in corridor spaces to conceal new ductwork and piping. Soffits shall be utilized in classroom areas to also conceal ductwork and piping. Three structural steel platforms will be installed on the roof to support new roof top air handling units. New LED lighting to be installed in classroom and corridor spaces. Project will also include an Add Alternate to replace the network and cabelling system throughout the school.

Details

Division 02 - Existing Conditions, Demolition, Selective Site Demolition, Selective Demolition.
Division 03 - Concrete, Concrete Forming, Architectural Cast-in Place Concrete Forming, Concrete Reinforcing, Non-Shrink Grouting.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Steel Framing, Steel Joist Framing, Metal Fabrications, Metal Stairs.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Interior Finish Carpentry, Plastic Paneling.
Division 07 - Thermal and Moisture Protection, Roof and Deck Insulation, Wall Panels, Metal Wall Panels, Insulated Metal Wall Panels, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Firestopping, Joint Sealants.
Division 08 - Openings, Access Doors and Panels, Access Doors and Frames, Louvers.
Division 09 - Finishes, Plaster and Gypsum Board Assemblies, Gypsum Board Assemblies, Gypsum Board Shaft Wall Assemblies, Supports for Plaster and Gypsum Board, Non-Structural Metal Framing, Gypsum Plastering, Gypsum Board, Acoustical Ceilings, Resilient Flooring, Carpeting, Tile Carpeting, Painting, Interior Painting.
Division 10 - Specialties, Visual Display Units.
Division 21 - Fire Suppression, Common Work Results for Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.
Division 27 - Communications, Common Work Results for Communications, Communications Backbone Cabling, Communications Services Cabling, Audio-Video Systems, Distributed Systems, Clock Systems, Wireless Clock Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Conductors and Cables for Electronic Safety and Security, Fire Detection and Alarm, Digital, Addressable Fire-Alarm Systems.
Division 31 - Earthwork.
Division 32 - Exterior Improvements.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents