Similar Projects
Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

Juvenile Detention Center Boiler Replacement
Alteration
Bidding
Olathe, KS 66061

Multi-Way Pad-Mount Switchgear with Fast Source Transfer Switch, Manufacture, and Delivery
Alteration
Bidding
Garden City, KS

Preventative Service Maintenance and Inspection of Commercial Chillers, Boilers and Pumps
Term Contract, Alteration
Post-Bid
Wichita, KS

Water Heater Replacement
Term Contract
Post-Bid
Kansas City, MO 64128

Holly Power Plant Replace Backup Boiler
Results
$175,700 est. value
Winfield, KS 67156

Hot Water Boiler 2 Tube Replacement and Boil-Out Procedure
Alteration
Results
Wichita, KS

2022 JCPRD Electrical Services IDIQ
Term Contract
Bidding
KS

State-of-the-Art Technical Sound System and House Lighting System
Alteration
Post-Bid
Hutchinson, KS

New Century Adult Detention Center Boiler Improvement Project
Alteration
Results
Olathe, KS 66061

FCA Install New Boilers
Term Contract
Bidding
Wichita, KS 67218

Generator Maintenance
Term Contract
Post-Bid
Wichita, KS 67204

Salina ERCIP Photovoltaic Solar Power and Water Reduction
Alteration
Results
Less than $2,691,821 est. value
Salina, KS

Crime Lab Solar Energy Supply
Term Contract
Post-Bid
Olathe, KS 66061

Last Updated 03/29/2022 11:17 AM
Project Title

Kaw Water Treatment Plant Electrical and Mechanical Improvements

Physical Address View project details and contacts
City, State (County) Lawrence, KS 66044   (Douglas County)
Category(s) Single Trades
Sub-Category(s) Electric, Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contract No. 2 is generally described as follows: • Modifications to the primary and secondary basins including replacement of horizontal paddle mixers in the flocculation basins, the sludge clarifier removal rakes and structural framework in the primary basins, and weirs and launders in both basins. • Replacement of the filter media, recoating of the filter box walls, replacement of the surface wash piping and sweeps, and ventilation improvements for Filter Nos. 5-8. • Replacement of the lime slurry preparation, feed equipment, control panels, dust collectors, and bin vibrators, including recoating the floor, painting the ceiling, and recoating the exterior of the silos and fill piping. • Electrical and I&C improvements associated with the work. • Miscellaneous rehabilitation work.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Humidity Control Equipment, Mechanical Dehumidification Units.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents