Last Updated | 03/29/2022 04:23 PM |
Project Title | Greenfield WRP Blower Electrical System Improvements |
Physical Address | View project details and contacts |
City, State (County) | Mesa, AZ (Maricopa County) |
Category(s) | Single Trades |
Sub-Category(s) | Electric |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $3,600,000 to $4,600,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Construction Manager at Risk (CMAR) to provide Pre-Construction Services and complete Construction Services as the CMAR for the Greenfield WRP Blower Electrical System Improvements project. This project includes the construction of redundant oil-filled distribution transformers and pad mounted switches for Power Centers 3A and 3C at the Greenfield Water Reclamation Plant. The improvements to Power Center 3A will include the installation of an oil cooled 12.47kV/4160V distribution transformer, 12.47kV pad mounted switch, replacement of the switchgear, new circuit breakers to isolate individual Reduced Voltage Soft Starters, new Reduced Voltage Soft Starters, and associated cable trays, conduits and ductbanks. The improvements to Power Center 3C will include the installation of an oil cooled 12.47kV/480V distribution transformer, 12.47kV pad mounted switch, the installation of a new section to existing switchgear to allow for a redundant power source connection and associated cable trays, conduits and ductbanks. City may include other miscellaneous improvements at the Site, as needed. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |