Similar Projects
Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

Design Building Residential Solar Street Lights
Post-Bid
Aguila, AZ

On-Call Electrical Services, Northern Region for Arizona State Parks and Trails
Term Contract
Post-Bid
Phoenix, AZ

D--SCADA EMS Grid Control Across WAPA Regions
Results
Phoenix, AZ 85009

Backup Generator Replacement WAPA DSW
Results
Phoenix, AZ 85005

J061--Transformer Inspection and Testing
Post-Bid
Phoenix, AZ 85012

General Electrical Services
Term Contract
Results
Fountain Hills, AZ 85268

G2 Fl Shack Electric Power Distribution Equipment
Post-Bid
Phoenix, AZ 85034

Arterial LED Cobra Lighting
Results
Tempe, AZ

21Q5034 VCC Electric Pwr Dist Equip
Post-Bid
Phoenix, AZ 85034

Solar System Maintenance and Repair Services
Results
Mesa, AZ 85211

6115--NAVAHCS, PVAHCS, SAVAHCS Emergency Standby Generator Maintenance
Term Contract
Post-Bid
Phoenix, Prescott, Tucson, AZ - Albuquerque, NM 86301

Solar Energy Systems
Term Contract
Results
Phoenix, AZ 85007

644- UPS Battery Replacement
Term Contract
Post-Bid
Phoenix, AZ 85012

Luke AFB Holiday Lights
Results
Luke Air Force Base, AZ 85309

Last Updated 03/29/2022 04:23 PM
Project Title

Greenfield WRP Blower Electrical System Improvements

Physical Address View project details and contacts
City, State (County) Mesa, AZ   (Maricopa County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,600,000 to $4,600,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction Manager at Risk (CMAR) to provide Pre-Construction Services and complete Construction Services as the CMAR for the Greenfield WRP Blower Electrical System Improvements project. This project includes the construction of redundant oil-filled distribution transformers and pad mounted switches for Power Centers 3A and 3C at the Greenfield Water Reclamation Plant. The improvements to Power Center 3A will include the installation of an oil cooled 12.47kV/4160V distribution transformer, 12.47kV pad mounted switch, replacement of the switchgear, new circuit breakers to isolate individual Reduced Voltage Soft Starters, new Reduced Voltage Soft Starters, and associated cable trays, conduits and ductbanks. The improvements to Power Center 3C will include the installation of an oil cooled 12.47kV/480V distribution transformer, 12.47kV pad mounted switch, the installation of a new section to existing switchgear to allow for a redundant power source connection and associated cable trays, conduits and ductbanks. City may include other miscellaneous improvements at the Site, as needed.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents