Similar Projects
Nice-Pak Expansion
New Construction - 1,296,000 SF
Conception
$165,000,000 est. value
Mooresville, IN 46158

Concrete Facility
New Construction - 250 SF
Conception
Less than $500,000 CJ est. value
Franklin, IN

Velmont Industries Concrete Plant
New Construction - 75,000 SF
Design
$30,000,000 est. value
Bristol, IN

Applied Fabricators Expansion
New Construction - 18,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Greenfield, IN 46135

Alliance Rv Plans Expansion
New Construction - 120,000 SF
Construction
$33,000,000 est. value
Elkhart, IN

RLL Racing State of the Art Racing Headquarters
New Construction - 100,000 SF
Pending Verification
$20,000,000 est. value
Zionsville, IN 46077

Southwork Metal Manufacturing Expansion
Renovation - 350,000 SF
Pending Verification
McCordsville, IN

Industrial Park Warehouse Manufacturing
New Construction - 1,390,900 SF
Conception
$10,000,000 CJ est. value
Indianapolis, IN 46219

Sortera Alloys Manufacturing Center
New Construction
Pending Verification
$4,200,000 est. value
Fort Wayne, IN 46805

Claeys Candy Company Expansion
Renovation - 45,000 SF
Conception
$8,000,000 est. value
South Bend, IN 46628

Hearthside Food Solutions Manufacturing Expansion
New Construction
Pending Verification
$13,600,000 est. value
Long Beach, IN 46360

Genova USA Expansion
Addition
Conception
$2,500,000 est. value
Rensselaer, IN 47978

Akyumen Manufacturing Plant
New Construction
Pending Verification
$100,000,000 est. value
Gary, IN 46404

Chore Time Brock Upgrades Facilities
Renovation - 38,000 SF
Conception
$19,700,000 est. value
Milford, IN 46542

Cheese Manufacturing Facility
New Construction
Pending Verification
$23,000,000 est. value
Morocco, IN

Last Updated 05/21/2021 05:15 PM
Project Title

Vehicle Service Group Expansion

Physical Address View project details and contacts
City, State (County) Madison, IN 47250   (Jefferson County)
Category(s) Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant
Contracting Method
Project Status Obtained from a News Source, Construction Start Expected fourth quarter 2020, Construction Completion Expected fourth quarter 2021
Bids Due View project details and contacts
Estimated Value $7,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

1 Manufacturing/Processing Plant, 1 Story Above Grade, Renovation Building.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents