Similar Projects
McKnight Watermain Improvements
Infrastructure
Bidding
$400,000 CJ est. value
North Saint Paul, MN 55109

Lake Vermilion State Recreation Area Trailside Campground ATV Bridge
Infrastructure
Bidding
$200,000 CJ est. value
Tower, MN 55790

South Kawishiwi Pavilion Ramp Construction and Log Repair
Infrastructure, Renovation
Post-Bid
$100,000 CJ est. value
Ely, MN 55731

South Kawishiwi Pavilion Ramp Construction and Log Repair
Infrastructure, Renovation
Post-Bid
$100,000 CJ est. value
Ely, MN 55731

Concrete Pavement Rehabilitation, Bituminous Surfacing
Results
MN

Garage and Basement Slabs
Renovation, Alteration
Results
Minneapolis, MN

Mora New High School - Work Scope 2 Only-Cast In Place Concrete
New Construction - 170,000 SF
Construction
$10,000,000 CJ est. value
Cloquet, Mora, MN 55051

Mora New High School - Work Scope 2 Only-Cast In Place Concrete
New Construction - 170,000 SF
Construction
$10,000,000 CJ est. value
Cloquet, Mora, MN 55051

Petroleum Infiltration Waterproofing and Concrete Work
Alteration
Post-Bid
Long Prairie, MN 56347

Landfill Precast Wall Repair
Alteration
Results
$150,000 to $175,000 est. value
Dundas, MN 55019

SPPS Jie Ming Mandarin Immersion Part 3 BP #3
Renovation
Construction
$3,000,000 CJ est. value
Saint Paul, MN 55116

Cellular Concrete
Term Contract
Post-Bid
Minneapolis, MN

Concrete Pipe Replacement
Alteration
Results
Olivia, MN

Jie Ming Mandarin Immersion Addition and Renovation - Part 2 Earthwork, Utilities, Building Demolition
Infrastructure - 20,000 SF
Construction
$1,086,550 CJ est. value
Saint Paul, MN 55116

As-Needed Concrete and Masonry Services
Term Contract
Post-Bid
MN

Last Updated 12/07/2022 02:18 PM
Project Title

Bid Package 2 - North High School CTE Renovations

Physical Address View project details and contacts
City, State (County) Minneapolis, MN 55411   (Hennepin County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Construction Management - CM at Risk, Competitive Bids
Project Status Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $25,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

1. The scope of work includes the transformation of the existing campus and 287,000 square foot facility. Additions will include a New Entry / Commons (31,000 SF), a replacement Auxiliary Gym (11,00 SF) that will function as a Storm Shelter, and an Electrical Room (500 SF). Renovation spaces will include Career and Technical Education (CTE), Media Center, Classrooms, Auditorium, Kitchen and Administrations Offices. Site work will include sanitary sewer and storm reroutes, new parking lots and an underground filtration system. This project also includes all associated HVAC, electrical and technology system replacements. a. This bid package will include the following: i. New Entry / Commons Addition (31,000 SF) ii. Some interior Renovations iii. Sanitary sewer and Storm reroutes iv. New parking lots v. Landscaping package vi. Underground filtration systems. For more information, please contact Jibril Osman at Jibril.Osman@mpls.k12.mn.us or 612-668-0465. Special School District No. 1 is an Equal Opportunity School District.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents