Similar Projects
Reported | 06/10/2020 12:00 AM |
Project Title | Dewatering Pumps at Portsmouth Naval Shipyard, Maine |
Physical Address | View project details and contacts |
City, State (County) | Kittery, ME 03904 (York County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Pumps and Wells |
Contracting Method | Competitive Bids. |
Project Status | Accepting Letters of Interest |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | For the P381 pumpwell, pumps are being procured for: main drydock dewatering, drydock drainage, and for auxiliary sea water (ASW). Three main dewatering pumps are provided, and are vertical turbine type pumps sized at 46,700 GPM each, at 26 FT TDH. Pumps are sized such that two pumps will lower the water level in the dry dock in 135 minutes or less as required by UFC 4-2.13-10 (pre-approval) paragraph 7-4.6. Each vertical turbine pump is driven by a 600 HP electric motor. |
||||||||||||
Details |
|
||||||||||||
Bidder's List | View project details and contacts | ||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |