Project Title | Scott Boulevard Watermain Replacement Phase III |
Physical Address | View project details and contacts |
City, State (County) | Decatur, GA (DeKalb County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Components of the work include the installation of a 30” DIP watermain inside the rightof-way and under the existing pavement. A portion of the project will remove the existing 24”/30” Watermain and replace with a 30” waterwain in the same trench with the remainder of the existing 30” steel watermain to be abandoned in place and filled with non-shrink grout. The site conditions will not be altered from the existing. All disturbed pavement and landscaping will be replaced in kind. C. Components also include the replacement and installation of 8-inch DIP Water main inside the right-of-way. The existing 6-inch and smaller water mains will be abandoned in place and filled with non-shrink grout, unless otherwise noted on the plans. The site conditions will not be altered from the existing. All disturbed pavement and landscaping will be replaced in kind. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |