Similar Projects
Garden Cemetery Phase 4 - City of Chelsea
Infrastructure
Conception
Less than $600,000 est. value
Chelsea, MA 02150

Garden Cemetery Phase 4 - City of Chelsea
Infrastructure
Conception
Less than $600,000 est. value
Chelsea, MA 02150

Harvard University Enterprise Research Campus
New Construction, Infrastructure - 61,500 SF
Design
$1,000,000,000 CJ est. value
Boston, MA 02134

Washington Street Mixed-Use Development
Addition, Demolition, New Construction, Renovation, Infrastructure - 26,626 SF
Design
$21,300,000 CJ est. value
Boston, MA 02130

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

727 Massachusetts Avenue Hotel Addition
Addition, Demolition, Renovation, Infrastructure - 51,250 SF
Post-Bid
$20,000,000 CJ est. value
Boston, MA 02203

South Coast Rail Offsite Traffic Improvements
Infrastructure
Post-Bid
$10,500,000 est. value
Boston, MA

Roadway, Ceiling, Arch and Wall Reconstruction and Other Control Systems in Sumner Tunnel DESIGN-BUILD PROJECT
Term Contract
Results
$111,175,000 est. value
Boston, MA 02111

Asphalt Resurfacing in Areas I, II and III
Infrastructure
Results
Boston, MA

NEXUS at the Allston Innovation Corridor
New Construction, Infrastructure
Construction
$100,000,000 CJ est. value
Boston, MA 02134

NEXUS at the Allston Innovation Corridor
New Construction, Infrastructure
Construction
$100,000,000 CJ est. value
Boston, MA 02134

Residences at Readville Station
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Boston, MA 02136

Soldiers Field Road Residential Development
New Construction, Infrastructure - 14,500 SF
Pending Verification
$198,000,000 CJ est. value
Boston, MA 02135

Cary Avenue Water, Sewer & Roadway - City of Chelsea
Alteration
Conception
$5,000,000 est. value
Chelsea, MA 02150

Neponset Wharf
New Construction, Infrastructure - 38,400 SF
Design
$90,000,000 CJ est. value
Boston, MA 02122

Last Updated 02/23/2023 11:57 AM
Project Title

Construction of a Shared Use Path (Neponset River Greenway) Including Boardwalk Br. No. B-16-309 (Prefabricated Aluminum Truss) Over Dorchester Bay

Physical Address View project details and contacts
City, State (County) Boston, MA 02203   (Suffolk County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction Commenced, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $8,845,076 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

AS of February 23, 2023, construction is underway and the general contractor is still accepting subcontractor pricing for select trades. An exact timeline for construction has not been confirmed. Location: Boston Project Type: Highway - Construction Federal Aid No.: CMQ-003S(273) MASSDOT - Construction of a Shared Use Path (Neponset River Greenway) Including Boardwalk Construction Bridge Number B-16-309 (Prefabricated Aluminum Truss) Over Dorchester Bay

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents