Similar Projects
Cooling Tower Repair
Alteration
Design
$16,066 est. value
Ridgeland, SC 29936

Removal and Reinstallation of Fume Hoods (Including Electrical)
Renovation
Design
$4,000 CJ est. value
Charleston, SC 29412

Petersburg Elementary School - Classroom/Cafeteria Upgrades to HVAC Units
Renovation
Sub-Bidding
$90,000 CJ est. value
Pageland, SC 29728

CCTC - Main Campus - HVAC Updates/Replacements
Renovation
Sub-Bidding
$900,000 CJ est. value
Sumter, SC 29150

St. James High School (SJHS) HVAC Renovations
Post-Bid
Murrells Inlet, SC 29576

Heating, Ventilation, and Air Conditioning (HVAC) Project for East North Street Academy
Post-Bid
Greenville, SC 29607

Chiller Replacement - Coastal Evaluation Center
Results
Ridgeville, SC 29472

Repair HVAC Dormitory Building 2405 and 2406
Results
$1,000,000 to $5,000,000 est. value
Charleston, SC 29404

CCTC - F.E. Dubose Campus - HVAC Updates/Replacements
Renovation
Design
$1,300,000 CJ est. value
Manning, SC 29102

Annual Boiler Inspection and Tuning
Term Contract
Sub-Bidding
Columbia, SC 29201

Statement of Qualifications For HVAC And Electrical Contractors
Post-Bid
Conway, SC

Chiller Replacement at Lightsey Center
Results
Charleston, SC 29401

Jasper County MHC HVAC Replacement
Renovation
Sub-Bidding
$45,000 CJ est. value
Ridgeland, SC 29936

MRD Water Treatment Maintenance
Post-Bid
Charleston, SC 29412

Chiller and Boiler
Results
Chester, SC

Last Updated 08/19/2022 04:08 PM
Project Title

Upgrade and Replace HVAC Units on Georgetown Building 100

Physical Address View project details and contacts
City, State (County) Georgetown, SC 29440   (Georgetown County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Replace HVAC equipment on Georgetown Building 100, along with associated electrical and controls. BId Security is Required in an Amount Not Less Than 5% of the Base Bid. Performance and Labor & Material Payment Bonds: the Successful Contactor Will Be Required to Provide Performance and Labor and Material Payment Bonds, Each in the Amount of 100% of the Contract Price. Construction Cost Range: $1,000,000 to $2,000,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents