Similar Projects
Water System Improvements
Infrastructure
Bidding
Candor, NY

Back Flow Prevention and Pump Station at SUNY Purchase
Renovation
Bidding
Harrison, Purchase, NY 10577

WPCP Low Lift Pump Improvements
Post-Bid
Poughkeepsie, NY 12601

Snowmaking Prefabricated Pump Station
Post-Bid
NY

CM Services - Riverfront Pump Station
Term Contract
Results
Albany, NY 12242

Tarbell Hill Pump Station Improvements
Term Contract
Results
Port Henry, NY 12974

Bay Park Conveyance
Term Contract
Construction
Less than $439,000,000 est. value
NY

West Main Street Pump Station Electrical Upgrades
Alteration
Bidding
Pawling, NY 12564

Stardust Pump Station
Post-Bid
Olean, NY 14760

Sanitary Pump Station Replacement -Evangola State Park
Results
Less than $200,000 est. value
Irving, NY 14081

Furnish and Install Durand Eastman Packaged Pump Station
Renovation
Bidding
Rochester, NY 14622

Emerson Park Sewer Station Repair
Post-Bid
Auburn, NY 13021

GC Phase 2 Water Supply, Contract 3: New Water Pump Stations
Term Contract
Results
Batavia, NY 14020

GC Phase 2 Water Supply Contract 3C and 3D: Golden Road Pump Station
Renovation
Bidding
NY

Gorge Pump Station Rehabilitation Niagara Falls Water Board
Post-Bid
Niagara Falls, NY 14304

Last Updated 07/27/2021 10:22 AM
Project Title

I-481 and S.R. Industrial Sewer Corridor Project

Physical Address View project details and contacts
City, State (County) DeWitt, NY 13057   (Onondaga County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method
Project Status Permitting, Construction Start Expected third quarter 2021, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the construction of a duplex pump station, valve pit, meter pit and control building located on Benedict Road in the Town of Dewitt. The project also includes the installation of approximately 11,000 lineal feet of 12” forcemain installed by directional drilling and 75 feet of 15” gravity sanitary sewer. The project also consists of power and controls for the Control Building and associated equipment required for a full operational pump station and control building.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents