Similar Projects
Clinton Avenue Improvements - City Of Huntsville
Infrastructure
Conception
$2,500,000 CJ est. value
Huntsville, AL 35801

Eastern Bypass - City Of Huntsville
Infrastructure
Conception
$10,600,000 CJ est. value
Huntsville, AL 35763

Margaritaville Hotel / Madison
New Construction, Infrastructure
Design
$20,000,000 CJ est. value
Madison, AL 35758

Balch Road Widening 15-021 - City of Madison
Infrastructure
Design
$1,681,304 CJ est. value
Madison, AL 35758

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Constellation Phase I Row Improvements
Infrastructure
Results
$809,415 CJ est. value
Huntsville, AL 35801

Highway 53 and Jeff Road Improvements
Infrastructure
Results
$1,191,129 CJ est. value
Harvest, AL 35749

Carillon Oaks Madison
Demolition, New Construction, Infrastructure - 35,195 SF
Construction
$9,500,000 CJ est. value
Madison, AL 35758

Livano Town Madison
New Construction, Infrastructure - 422,545 SF
Construction
$119,000,000 CJ est. value
Madison, AL 35758

Paxton Place Apartments
New Construction, Infrastructure
Pending Verification
$125,000,000 CJ est. value
Madison, AL 35758

Toyota Expansion
Addition, Demolition, Infrastructure - 114,000 SF
Pending Verification
$222,000,000 CJ est. value
Huntsville, AL 35810

Holmes Avenue Improvements - City Of Huntsville
Infrastructure
Conception
$17,000,000 CJ est. value
Huntsville, AL 35805

Whitesburg Animal Hospital
Addition, Build-out, Renovation, Infrastructure
Design
$1,000,000 CJ est. value
Huntsville, AL 35802

Transit Transfer Station
New Construction, Infrastructure
Post-Bid
$15,677,228 CJ est. value
Huntsville, AL 35801

Last Updated 10/03/2023 07:05 AM
Project Title

Propulsion Systems Laboratory / Redstone Arsenal

Physical Address View project details and contacts
City, State (County) Redstone Arsenal, AL 35808   (Madison County)
Category(s) Government/Public, Heavy and Highway, Laboratory
Sub-Category(s) Laboratory, Military Facility, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $99,800,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Construct a Propulsion Systems Laboratory consisting of modernization and expansion of existing facilities and construction of new stand-alone facilities to support RDT&E of propulsion systems and energetic propellants. Project includes the following: modernization of thirteen existing facilities (63,203SF), new facility for six new propellant mixing bays (4,673SF); water proofing of existing Earth Covered Magazines; new Storage Facility (5,000SF); new Control Building (1,800SF); two new Data Acquisition Buildings (450SF EA); new Conditioning Building (600SF); new Rocket Motor Assembly Building (1,500SF); three new Inert Storage Buildings (1,200SF EA); and new Large Rocket Motor Segmenting/ Disassembly Facility (4,800SF). Work includes building information systems, fire protection and alarm systems, mass notification, access control, intrusion detection, energy monitoring and control systems, sustainability, and energy enhancement measures. Supporting facilities include site development, grading, parking, utilities, lighting, paving, walks, curbs, storm drainage, landscaping, signage, physical security, and AT/FP. Demolition of existing facilities will be required. #1-#6 have been issued as of 8-18-2023. *The list for this project may be incomplete. If you have been invited to on this project by the owner, please notify our editorial staff at contentcase@constructconnect.com.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Specialty Casework, Laboratory Casework, Countertops, Laboratory Countertops, Office Furniture, Institutional Furniture, Laboratory Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, HVAC Fans, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents