Similar Projects
Last Updated | 04/25/2022 10:26 AM |
Project Title | Fence to Fence (F2F) Environmental Services at Joint Base McGuire-Dix-Lakehurst, NJ; Hanscom Air Force Base (AFB), MA; New Boston AFS, NH; and Rome Labs, NY |
Physical Address | View project details and contacts |
City, State (County) | New Boston, NH - McGuire AFB, NJ - Rome, NY (Middlesex (MA) - Hillsborough (NH) - Burlington (NJ) - Oneida (NY) County) |
Category(s) | Single Trades |
Sub-Category(s) | Environmental |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Project Description: The requirement is for an Environmental Services contract to support the Air Force at Joint Base McGuire-Dix-Lakehurst, NJ; Hanscom AFB, MA; New Boston AFS, NH; and Rome Labs, NY and encompasses the full range of methods, technologies, and supporting activities necessary to conduct environmental operations and services efforts to address F2F compliance needs. Each installation requires support in one or more of the following programs: Hazardous Waste (HW), Hazardous Material Management, Environmental Sampling and Analysis, Air Quality, Wastewater and Stormwater, Drinking Water, Natural Resources Management, Cultural Resources Management, Solid Waste Management, Pollution Prevention, Petroleum Oil and Lubricants Management, Storage Tank Environmental Compliance and Toxic Substances Control Act (TSCA), as needed/regulated by state or region. The period of performance for this contract will be five (5) years. General Scope and Requirements: The Air Force Civil Engineer Center (AFCEC) is required to conduct F2F environmental operations to enable the mission, protect human health and the environment and comply with laws. The goal of the F2F is to ensure the AF complies with environmental regulations, while effectively and efficiently managing the program in a performance-based, results-oriented, and cost-conscious framework. It is the policy of DoD and AFCEC to use innovative and sustainable approaches to environmental management and technology to accomplish its mission. Sustainable approaches are considered to: not deplete resources, not cause environmental degradation, or impact human health. The Contractor shall utilize pollution prevention and sustainability initiatives as applicable. The Contractor shall operate in a manner that promotes energy management to include energy efficiency, use of renewable energy, and water conservation. The Contractor shall comply with each respective installation’s Environmental Management System (EMS). The Contractor shall function as an integral team member in support of the DoD mission, to include sharing of information with other DoD contractors and cooperation with communities, regulators, and other government entities. Contractor requirements shall include the efficient management of resources and timely submission of accurate deliverables and shall identify any developing solutions to impediments that may jeopardize successful project execution. Technical requirements include, but are not limited to, early involvement in the process to allow for the development of the most cost-effective and technically sound approach or solution. When GIS data is delivered as part of these Environmental Program requirements, the data shall adhere to current SDSFIE data standards as specified by AFCEC (or Air Force) Environmental GIS Program. The AFCEC client will rely on the Contractor’s expertise in recognizing and addressing problematic issues and successful execution of this project. Contractor experience and knowledge with the numerous federal and state regulatory requirements associated with each program (HW, Solid Waste, Air Quality, etc) is critical to success. |
||||||||||||||||||
Details |
|
||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |