Similar Projects
Add Lanes and Reconstruct/Drainage Improvements/Base Work/Bridge Construction/Clearing and Grubbing - 3990602
New Construction, Infrastructure
Bidding
$64,267,058 est. value
Tallahassee, FL 32318

Babcock Ranch WMA - Deep Freeze South
Infrastructure
Bidding
$380,000 est. value
Tallahassee, FL

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Woodward Avenue Improvements
Infrastructure
Post-Bid
Tallahassee, FL 32304

Welaunee Boulevard Segment 3B Construction Project
Results
Tallahassee, FL 32308

Van Buren Street Improvements
Results
Tallahassee, FL 32301

Danfoss Turbocor Expansion
New Construction - 90,000 SF
Construction
$1,800,000 est. value
Tallahassee, FL 32310

Viridian One
New Construction, Infrastructure - 172,839 SF
Construction
Tallahassee, FL 32304

Betton Road Traffic and Pedestrian Enhancement Project and Hickory and Spruce Water Main Improvements
Results
Less than $3,678,098 est. value
Tallahassee, FL 32301

Richview Road Pass Construction Project
Term Contract
Results
$3,500,000 est. value
Tallahassee, FL 32301

Resurfacing
Results
$6,879,936 est. value
FL

Apalachee Regional Park Entrance and Other Miscellaneous Improvements Project
Results
Less than $900,000 est. value
Tallahassee, FL 32311

Pine Forest Drainage Improvements Project
Results
Tallahassee, FL

Smith Creek Bike Lane Additions - Phase I and Phase II
Results
Tallahassee, FL 32310

Strategic Resource Evaluation Study - Highway Construction Materials
Infrastructure
Results

Last Updated 06/14/2022 08:03 AM
Project Title

Bayou Concrete - Four Points Way / Tallahassee

Physical Address View project details and contacts
City, State (County) Tallahassee, FL 32305   (Leon County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation.
Project Status Conceptual Design, Construction Start Expected January 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope includes the new construction of a ready-mix concrete batch plant, office and storage space on 7.43 acres. Scope detail have not been released. As of June 13, 2022 the project is in early planning stage. A pre-application meeting is scheduled for June 15, 2022 with the City of Tallahassee. Information regarding the architect, general contactor and method of selection has not been disclosed. The construction timeline has not been determined, but is not expected to begin before the first quarter of 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Manufacturing/Processing Plant, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents