Similar Projects
Estes Park Campground at Mary's Lake Water and Electrical Distribution System Improvements Phase 2
Post-Bid
$500,000 est. value
Estes Park, CO 80517

Holiday Lighting
Alteration
Post-Bid
Fort Collins, CO

Current Transformer
Infrastructure
Results
Fort Collins, CO

Wood Utility Pole
Infrastructure
Results
Loveland, CO

Emergency Power Projects
Renovation
Post-Bid
$800,000 CJ est. value
Fort Collins, CO 80521

District Generator Services
Term Contract, Alteration
Results
Fort Collins, CO

Service Center Administration Lighting Upgrade
Alteration
Post-Bid
$215,327 est. value
Loveland, CO 80537

Valley Substation Battery System
Alteration
Results
Loveland, CO

Transformer Boxpad
Alteration
Post-Bid
Fort Collins, CO 80521

FY 23 Signal Pole Replacement
Infrastructure
Results
$2,118,114 CJ est. value
Fort Morgan, CO 80701

Backup Generators
Alteration
Post-Bid
Fort Collins, CO

Lincoln Center Theatre Lighting Replacement
Alteration
Results
$700,000 est. value
Fort Collins, CO 80521

Lightning Protection for Water Treatment and Water Reclamation Facilities
Alteration
Post-Bid
$130,000 est. value
Wellington, CO

Pulse Locate Retrofits
Renovation
Results
$1,274,614 CJ est. value
Loveland, CO 80537

Cable, U.G. 600V, AL, Compressed, Triplex
Alteration
Post-Bid
Fort Collins, CO 80521

Last Updated 08/15/2023 04:12 PM
Project Title

RFQ D/B - Repairs/Upgrades to Mechanical, Electrical Systems \ Ft. Collins

Physical Address View project details and contacts
City, State (County) Fort Collins, CO 80525   (Larimer County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Sub-Bidding, Request for Qualifications, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $327,913 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Repairs/Upgrades to Mechanical, Electrical Systems. Estimated Construction Cost: $327,913. Question Deadline 07/31/2023 at 12:00 PM MT Anticipated General Contractor Start 8/31/2023 Anticipated Construction Start/Finish 9/4/2023 Project Description: Energy Upgrades of Mechanical and Electrical Equipment Including New Rooftop Hvac Units, Revised Ducting, Revised Controls, and Installation of New Led Light Fixtures With Occupancy Sensors. Work Includes Augmentation to Existing Structural Components to Accommodate the New, Heavier, Rtus. Existing Building Construction: One Story Pre-engineered Steel and Masonry Constructed in 1998. Building Construction Type: V-n, Non-sprinkled. Existing Occupancy: Mixed (B/s-3) With One Hour Occupancy Seperation. No Change of Use or Occupancy. No Change in Building Height, Area or Building Footprint.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents