Similar Projects
Central Region AE IDIQ
New Construction, Term Contract
Design
$25,000,000 est. value

Contractor - Lead Private Service Line Replacement Program
Infrastructure
Design
Shorewood, WI

RFQ - Engineering and Professional Services at Milwaukee Mitchell International Airport (MKE)
Term Contract
Bidding
Milwaukee, WI 53207

RFP - Annual Emergency Generator Servicing and Testing at System Wide - Various Locations
Term Contract
Bidding
Milwaukee, WI 53202

Project Engineering and Design Services for New Chilled Water Plant
New Construction, Alteration
Post-Bid
Milwaukee, WI

Preliminary Engineering - Siphons-Phase 1
Term Contract
Post-Bid
Milwaukee, WI

Water Tank Inspections, OCONUS and CONUS
Results
$10,000 to $5,000,000 est. value

NGB Fire Protection - National Architect and Engineering Indefinite Delivery Indefinite Quantity Contract
Results
$70,000 to $10,000,000 est. value
Washington, DC

UWMIL Central Heating Plant Chiller Replacement
Renovation
Design
$13,360,000 CJ est. value
Milwaukee, WI 53202

RFP - Rail Corridor Safety Study Grant
Term Contract
Bidding
Milwaukee, WI 53202

Preliminary Engineering - Siphons-Phase 1
Infrastructure
Post-Bid
Milwaukee, WI

National Architecture/Engineering/Interiors (IDIQ) Contract
Results
Less than $25,000,000 est. value

RFP - IH 894 and IH 43
Term Contract
Bidding
West Allis, WI 53214

Engineering Services - Dredged Material Management Facility
Infrastructure
Post-Bid
Milwaukee, WI

Indefinite Delivery Indefinite Quantity Architectural-Engineering Contracts
Results

Last Updated 01/06/2023 03:18 PM
Project Title

RFP Design - Modernization - WASF Facility

Physical Address View project details and contacts
City, State (County) Milwaukee, WI 53204   (Milwaukee County)
Category(s) Professional Services
Sub-Category(s) Engineering
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected January 2024 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $25,000,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of January 6, 2023, this project is in the conceptual phase. An engineer has been selected but not awarded. Although a firm timeline for construction has not been determined, construction is not expected to start prior to December 2023. *The closed solicitation has been included below for reference: The West Allis Service Facility (WASF) houses three distinct functions within three buildings on its Hawley Road site: Southeast Region (SER) Electrical Unit Shop & Warehouse; SER Materials, HMA & Soils Testing Laboratory; and Bureau of Traffic Operations (BTO) Signal Cabinet Shop. Constructed in the 1980s, the WASF consists of three buildings and outside on-site storage on a 5.55 acre site. This facility requires modernization at the existing site or functional replacement at a new site Stage 1 Contract: Building upon a previous feasibility study and additional review/interviews, prepare a functional and condition assessment of the existing facility; develop a conceptual building layout, site plan, and cost estimate of existing facility modernization; develop a conceptual building layout, site plan, and cost estimate of functional replacement; for the preferred alternative, continue building plan concepts and site plan design development through 30% completion. Anticipated services include site development and site circulation design, architectural design, building engineering and related services. The selected consultant will coordinate extensively with WisDOT for assessment of the existing and potential new sites. The functional replacement conceptual building layout and site plan should be applicable to a range of parcel sizes and configurations. A future staged contract could include final plan development of site and building design of the preferred alternative to PS&E. Anticipated Construction Cost: $20,000,000-$24,999,999 The contract price will be based on an estimate of the selected consultant's actual costs plus fixed fee. Actual costs will be defined as those costs allowable under the cost principles in Part 31 of Federal Acquisition Regulation (FAR). Consultant costs including indirect cost rates and cost accounting system will be subject to audit. Consultant firms that are unable to account for costs consistent with requirements of the FAR are not eligible to contract. Consultants selected will be required to either submit or have on file with WisDOT a Consultant Financial Report prior to contract execution. Advertised Fixed Fee % : 7.25 Fixed Fee Notification : The fixed fee for this contract will apply an indirect cost factor of 150% to the consultant's estimated direct labor, regardless of the consultant's actual indirect rate. Interview: Interviews will not be conducted Questions are provided below. At least eight (8) business days before the interview, short-listed firms will be provided specific interview time and location. Interview Date: 08/03/2022 Interview Place: Southeast Region Office; 141 NW Barstow St.; Waukesha, WI 53187 The method of contractor selection has not been determined at this time. WisDOT - SE 01 RFP Design - Modernization - WASF facility

Details

Division 31 - Earthwork.
Division 32 - Exterior Improvements.
Division 33 - Utilities.
Division 34 - Transportation.
Division 35 - Waterway and Marine Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents