Similar Projects
New Flooring
Post-Bid
Huntington, UT

Gale Center Flooring Replacement
Post-Bid
South Jordan, UT 84095

Rubber Tile Flooring - Rubber Tile Flooring
Term Contract
Results
UT

Wash Bay Platform Fabrication
Results
South Jordan, UT 84095

Gym Floor Refinish and Repaint
Post-Bid
Castle Dale, Ferron, Green River, Huntington, UT 84525

Installation of New Carpet and Tile and for Surface Preparation and Application of New Paint Throughout the Delta City Complex
Results
Delta, UT

Jordan High School Floor Covering Replacement
Post-Bid
Sandy, UT 84070

Flooring Services for Spence and Cleone Eccles Football Center
Results
Salt Lake City, UT 84108

Replacement and Installation of Carpet
Post-Bid
Price, UT

Alumni House Stair and Floor Replacement
Results
Less than $300,000 est. value
Salt Lake City, UT 84112

Specialty Flooring for Rice-Eccles Stadium
Term Contract
Post-Bid
Salt Lake City, UT 84112

DFCM Construction-Standard Low Bid-Uintah Tech Flooring Replacement
Results
$400,000 est. value
Roosevelt, UT 84066

President’s Residence Flooring
Post-Bid
Ephraim, UT 84627

South Valley Sanctuary Kitchen Floor Replacement
Results
Less than $18,000 est. value
West Jordan, UT 84084

Portable Basketball Floor for Uccu Center
Post-Bid
Orem, UT

Reported 03/27/2019 04:23 PM
Project Title

Bonneville High School Floor and Wall Tile Project

Physical Address View project details and contacts
City, State (County) Ogden, UT   (Weber County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status All Bids Rejected
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description 54 Square feet of floor tile and 240 square feet of wall tile. Floor tile will be a 2x2 sheet tile, there will be two drains in the floor slope and build of floor will need to be done to accommodate drainage. There will need to be a floor curb built into the tile floor to allow for separation to shower drain. Wall tile will be a 4x4 or 4x12. Wall tile will have a color feature. All colors and patterns must be approved by Weber School District Carpentry Department.
Details
Division 09 - Finishes, Flooring.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents