Similar Projects
Sludge Dewatering and Drying Facilities
New Construction
Bidding
Concord, Griffin, GA 30223

Sludge Dewatering and Drying Facilities
New Construction
Bidding
Concord, Griffin, GA 30223

FY 2019 Southeast WWTP Improvements Phase II
Post-Bid
Douglas, GA 31533

Baconton Wastewater Treatment Plant Improvements
Post-Bid
Less than $175,000 est. value
Baconton, GA 31716

UV Disinfection System Replacement
Results
Less than $164,927 est. value
Statesboro, GA 30458

North WPCP Improvements
Results
Hawkinsville, GA

Middle Oconee WRF Maintenance Building
New Construction
Construction
Less than $1,345,000 est. value
Athens, GA 30606

Biosolids System Improvements - Digester Covers
Post-Bid
Augusta, GA 30901

James Creek Building Repairs
Results
Less than $63,030 est. value
Suwanee, GA 30024

Mill Creek Water Pollution Control Plant
Post-Bid
Chatsworth, GA 30705

Bar Screen and Grit Removal Equipment Replacement
Results
Fitzgerald, GA

Bioxide Odor and Corrosion Control
Term Contract
Post-Bid
Savannah, GA 31400

Operation and Maintenance Services for Wastewater Facilities and Pump Stations in the North Fulton Service Area
Results
Atlanta, GA

Membrane Replacement on Anaerobic Digester Covers Water Pollution Control Plant
Post-Bid
Milledgeville, GA

WWTP Influent Screening Equipment
Results
Waycross, GA 31501

Last Updated 02/06/2020 03:59 PM
Project Title

Rubes Creek Water Reclamation Facility Dewatering Building Modifications Project

Physical Address View project details and contacts
City, State (County) Woodstock, GA   (Cherokee County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work generally consists of replacing the existing dewatering equipment (centrifuge) with a volute press and high solids pumping unit to deliver the dewatered sludge to the dumpster area, modifications to the existing dewatering building (including new siding, roof, insulation, concrete floors, control room, etc.) and constructing a new dumpster pad with roof. The Owner has pre-purchased the PW Tech volute press and Moyno high solids pump and twin-screw feeder.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents