Similar Projects
YMCA Expansion
Addition, Infrastructure
Conception
$1,000,000 CJ est. value
Sylvania, OH 43560

Universal Metals Expansion
Addition, Infrastructure - 75,000 SF
Conception
$40,300,000 CJ est. value
Toledo, OH 43611

Enclave At Fallen Timbers - Monclova Township
New Construction
Design
Waterville, OH 43566

West Central Avenue Apartments
New Construction, Infrastructure - 124,900 SF
Design
$34,000,000 CJ est. value
Toledo, OH 43606

Collins Park Water Treatment Plant Lagoon Dam Overflow Modifications
Renovation, Infrastructure
Bidding
$500,000 CJ est. value
Toledo, OH 43605

Miscellaneous - SR 65/SR 163
Infrastructure
Bidding
$509,860 CJ est. value
Oregon, OH 43616

Maumee Bay Boardwalk Improvements - Ohio Department of Natural Resources
Infrastructure
Post-Bid
$5,700,000 CJ est. value
Oregon, OH 43616

Renovation of 7 Casualty Loss Units
Renovation
Post-Bid
Toledo, OH

Underground Utility Infrastructure Upgrades
Infrastructure
Results
$182,940 CJ est. value
Toledo, OH 43606

Component 2: Reconstruction of Dock Face Phase 3 - Rebid
Infrastructure
Results
$11,310,000 CJ est. value
Toledo, OH 43605

Construction Management at Risk Services RFQ - Parking Lot Project 2021
Construction
$8,000,000 est. value
Toledo, OH 43609

Bridge Ramp Replacement 2022
Demolition, New Construction, Infrastructure
Construction
$2,149,941 CJ est. value
Toledo, OH 43609

Street Resurfacing and Reconstruction - Toledo
Infrastructure
Pending Verification
$5,440,000 CJ est. value
Toledo, OH 43604

Nature's Nursery Wildlife Rehabilitation Center
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Whitehouse, OH 43571

Vitalia Senior Living Sylvania
New Construction, Infrastructure
Conception
$60,600,000 CJ est. value
Sylvania Township, OH 43617

Last Updated 05/24/2023 01:09 PM
Project Title

Site Improvements to Oak Grove Estates

Physical Address View project details and contacts
City, State (County) Holland, OH 43528   (Lucas County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Single-Family Homes, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $2,301,149 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of May 24, 2023, this project has not yet been awarded. A timeline for award has not yet been established.**  Q/A Cutoff Date: 03/31/2023 Q/A Cutoff Time: 12:00 PM EDT An Asbestos Inspection Survey was performed by Watterson Environmental & Facilities Management (Watterson) at the Oak Grove Estates facilities at the request of the Lucas Metropolitan Housing Authority (LMHA). The survey was conducted by Mr. Kristopher Barnswell on May 29, 2015, and June 1, 2015. Mr. Barnswell is an Ohio Certified Asbestos Hazard Evaluation Specialist (CAHES). Refer to Appendix C for a copy of Mr. Barnswell's license. This survey included the assessment, quantifying, and sampling of suspect asbestos-containing materials (ACMs) from the common and mechanical areas within the buildings and exterior, with the exception of roofing materials which were not included within the scope of work of this survey. Only one residential unit (9842 Oak Place Court Apartment C) was assessed to provide representative information for the residential units. However, additional materials may be present within other residential units not surveyed. In addition, this was not completed as a destructive survey, and additional materials may be present that were not accessible during this project. Table 1.0 identifies ACMs, if any, that were identified during this Asbestos Inspection Survey. Figures (included in Appendix A) show the sampling locations and location of the ident

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents