Similar Projects
Misc. Buildings, Site Development Construction Project Lead, San Jose, CA 95113 (Santa Clara County)
Last Updated | 08/16/2022 07:05 AM |
Project Title | Minor Public Work: SJC Economy Lot 1 Bioretention Cell |
Physical Address | View project details and contacts |
City, State (County) | San Jose, CA 95113 (Santa Clara County) |
Category(s) | Government/Public, Heavy and Highway |
Sub-Category(s) | Misc. Buildings, Site Development |
Contracting Method | Competitive Bids |
Project Status | Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $277,410 [brand] Estimate |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project involves the construction of a new 2,640 square foot bioretention cell to treat stormwater runoff from a drainage area of approximately 1.44 acres within the Airport's Economy Parking Lot 1. This project will serve as alternative Municipal Regional Permit Provision C.3 compliance to treat stormwater runoff generated by the Airport's Interim Facility construction. Question Deadline 08/04/2022 03:00:00 PM PT PREVAILING WAGES (Municipal Affair) This project is a "public works" as defined in Sections 1720 through 1720.6 of the California Labor Code. In accordance with Chapter 14.09 of the San Jose Municipal Code entitled "Prevailing Wage Requirements for City Contracts Involving Public Works," the contractor will be required to comply with the prevailing wage provisions in California Labor Code Sections 1720 through 1861, and the City's Office of Equality Assurance is authorized to provide certain local enforcement of those provisions. As such, the contractor will need to pay not less than the general prevailing rate of per diem wages and the general prevailing rates for holiday and overtime work. See Section 7-1.01a(3) of the Special Provisions for the prevailing wage requirements applicable to the contract. Copies of the prevailing rate of per diem wages and the general prevailing wage rates for holiday and overtime work in effect for this project are on file and available for your review from the City's Office of Equality Assurance at 408-535-8430. Bidders must have a California contractor's license, classification _A or C-27_ to bid this project. Bidder's attention is directed to those provisions of the Specifications which require the contractor to whom the contract for the work is awarded, to file with the City Clerk at the time the contract is executed, a Contractor's Payment Bond and a Bond for Faithful Performance meeting all the requirements of the Specifications and approved by the City Attorney of the City of San Jose. Bonds shall be executed by a surety possessing a valid certificate of authority issued by the California Department of Insurance and shall name the City of San Jose as beneficiary. The Contractor's Faithful Performance Bond shall be for 100% of the contract amount. The Contractor's Payment Bond shall be for 100% of the contract amount. Goals for minority participation for each trade: 19.6% Goals for female participation in each trade: 6.9% Under the DBE program, the City has established an overall DBE participation goal of 4.1% for the Airport for Federal Fiscal Years 2020-2022 |
||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |