Similar Projects
Last Updated | 02/23/2022 05:05 PM |
Project Title | Buckingham Road and Orange River Boulevard - Signalization Replacement |
Physical Address | View project details and contacts |
City, State (County) | Fort Myers, FL 33990 (Lee County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Traffic Signalization |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 1.Contractor to provide construction services at the intersection of Buckingham Road and Orange River Boulevard in Buckingham. The scope of work encompasses the construction of a replacement mast arms at a signalized intersection and includes, but is not limited to, signal work, mast arm replacement, vehicle detection, and concrete work. 2. This project consists of removing and installing mast arms in the exact same locations and during construction either utilizing portable traffic signals or installing a temporary traffic signal. The contractor shall be required to submit a complete Temporary Traffic Control Plan for review and approval at the pre-construction meeting. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |