Similar Projects
Reported | 07/06/2022 12:00 AM |
Project Title | Simulator Suite Renovations and Storage |
Physical Address | View project details and contacts |
City, State (County) | Wilmington, DE 19801 (New Castle County) |
Category(s) | Commercial, Government/Public |
Sub-Category(s) | Misc. Buildings, Warehouse/Storage |
Contracting Method | Competitive Bids. |
Project Status | Bidding, Construction Start Expected August 2022 |
Bids Due | View project details and contacts |
Estimated Value | $225,000 [brand] Estimate |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Program for this Renovation is to remove the end walls of each Simulator Room, as well as their glazing panels, and extend the four spaces into the former Projection Room. This will require the extension of the existing partitions as well as the installation of a new raised access flooring system to match the existing in size and height. The partitions of the Simulator Rooms will extend from the concrete floor span to the underside of the floor deck above. There will be new and relocated electrical outlets and Cat6 connects for the new simulators. Please note: All Cat6 cabling to be coordinated with and provided by Amtrak's C&S Division. The HVAC for the existing simulator rooms is fed from an existing rigid trunk run with flexible duct extensions. The Projection Room has two diffusers from a singular rigid duct with flexible extensions. This system is to be modified to provide two additional flexible ducts to serve the northern end of the new Simulator Rooms. Exhaust air is pulled through the existing plenum and shall be coordinate with the Simulator Room extensions. The sprinkler heads in the Projection Room are to be modified to serve the Simulator Room extensions with additional sprinkler heads as required. Overhead lighting for the Simulator Rooms. The acoustic ceiling tile (ACT) grid in the existing Simulator Rooms shall be extended into the new area of the extended rooms. Coordinate the HVAC supply, returns and sprinkler heads. Provide electrical outlets and plywood backing behind the proposed video monitors and coordinate with C&S and Amtrak IT for their installation of video monitors Cap the existing pipe that extends beneath Room 130 into Room 131, cover and patch with drywall and paint. |
||||||||||||||||||
Details | Misc. Buildings, Renovation, Warehouse/Storage, Renovation.
|
||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |