Similar Projects
Two Rivers - Kewaunee Const Ops / Cold10 / HSIP
Infrastructure
Design
$8,000,000 CJ est. value
Manitowoc, WI 54220

Two Rivers - Kewaunee Const Ops / Cold10 / HSIP
Infrastructure
Design
$8,000,000 CJ est. value
Manitowoc, WI 54220

Water Line Replacement
Infrastructure
Bidding
$290,000 CJ est. value
Two Rivers, WI 54241

2023 Hingiss Park Pedestrian Bridge Structure Construction
Demolition, New Construction, Infrastructure
Bidding
$900,000 CJ est. value
Kiel, WI 53042

Mishicot High School - Track and Field Redevelopment
Renovation
Post-Bid
Mishicot, WI 54228

Concrete Paving Program
Infrastructure
Post-Bid
Manitowoc, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Howards Grove - Kiel, STH 32/57 South Junction
Infrastructure
Results
$75,000 est. value
WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Repair SSG Andrew Miller ARC Manitowoc, WI
Addition, Demolition, Infrastructure, Renovation - 17,578 SF
Pending Verification
$9,379,249 CJ est. value
Manitowoc, WI 54220

Repair SSG Andrew Miller ARC Manitowoc, WI
Addition, Demolition, Infrastructure, Renovation - 17,578 SF
Pending Verification
$9,379,249 CJ est. value
Manitowoc, WI 54220

Forest Avenue Apartments
New Construction, Infrastructure - 61,206 SF
Design
$17,000,000 CJ est. value
Two Rivers, WI 54241

Watermain Replacement on North 2nd Street and North 3rd Street
Infrastructure
Bidding
$480,000 CJ est. value
Manitowoc, WI 54220

Chip and Seal Surfacing
Infrastructure
Post-Bid
$80,000 est. value
Cleveland, WI

Last Updated 03/09/2023 09:02 PM
Project Title

Remove and Replace Existing Sidewalks

Physical Address View project details and contacts
City, State (County) Manitowoc, WI 54220   (Manitowoc County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $178,987 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

It is the intent of the City of Manitowoc to have the Contractor furnish all necessary materials, labor, equipment and all incidental items necessary for the removal and replacement of existing concrete sidewalks that are deemed defective (Green Dot) at various locations within the City. The abutting Property Owners have the option to replace the defective sections of sidewalks privately before the start of sidewalk work under this Contract. There is a map showing the area of the remove and replace sidewalk district at the end of these Special Provisions and Conditions. The 2023 sidewalk district area is bounded by South 14th St., South 21st St., Franklin St. and Marshall St. The Contractor shall perform the sidewalk construction work in the following sequence. 1) Remove and Replace Sidewalk District. 2) City-Wide Complaints. A Bid Bond or Surety 2000 in the amount of 5% of the bid must accompany each proposal as a guaranty.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents